Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›With scheduled maintenance stoppage on, Brazilian FPSO goes offline
Fossil Energy

May 10, 2023 · about 3 years ago

With scheduled maintenance stoppage on, Brazilian FPSO goes offline

Enauta has initiated a scheduled maintenance shutdown for an FPSO, which is currently working on a field offshore Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta has initiated a scheduled maintenance shutdown for a floating, production, storage, and offloading (FPSO) vessel, which is currently working on a field offshore Brazil.

Enauta brought forward the preventive maintenance at the FPSO Petrojarl I process plant, previously scheduled to start in mid-May, kicking it off on 7 May 7 2023. As a result, the production at the Atlanta field was interrupted. The production is slated to be restored in June 2023.

With estimated reserves of 106 MMbbl, the Atlanta field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which also has a 100 per cent interest in this asset. Located in block BS-4 in the Santos Basin , at a 1,500-metre water depth, the field has been producing since 2018 through an Early Production System (EPS) – comprising three wells connected to the FPSO Petrojarl I.

However, the third well, 7-ATL-2HP-RJS, remained inoperative last month as it needs to have its pump replaced by a reserve pump. At the time, the Brazilian player outlined that the return to production was scheduled for the month of June, after the planned shutdown.

Furthermore, the company bought the FPSO OSX-2 for Atlanta’s Full Development System (FDS) last year. This FPSO, known as the FPSO Atlanta , which will replace the FPSO Petrojarl I, is anticipated to be fully operational by 2024. The FDS is expected to be online by mid-2024, originally with six wells , reaching ten wells in 2029 .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free