Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Survey commences at Fred. Olsen Seawind and Vattenfall’s ScotWind site
Offshore Wind

June 12, 2023 · about 3 years ago

Survey commences at Fred. Olsen Seawind and Vattenfall’s ScotWind site

A preliminary geophysical and environmental survey campaign has started at the Muir Mhòr floating wind project site in Scotland, being developed by Fred. Olsen Seawind and Vattenfall. The survey campaign will take place along the export cable corridor for the Muir Mhòr floating offshore wind project

2 minutes read
  • LinkedIn
  • X
  • Email
A photo of the white-red survey vessel EGS Ventus
EGS Ventus; Photo source: EGS Survey

A preliminary geophysical and environmental survey campaign has started at the Muir Mhòr floating wind project site in Scotland, being developed by Fred. Olsen Seawind and Vattenfall.

The survey campaign will take place along the export cable corridor for the Muir Mhòr floating offshore wind project from June to July 2023.

Operations will be conducted by the UK-headquartered company EGS Survey from Peterhead Port using the vessel EGS Ventus .

The survey involves data collection using both towed and onboard equipment, as well as drop-down camera and grab samples throughout the site area.

According to a press release from the project partners from January, ESG Survey has signed a multi-million-pound contract for the work which will support site characterisation.

Related Articles

Offshore Wind

EGS Survey to start work at Fred. Olsen Seawind and Vattenfall’s ScotWind site

2 min read

Meanwhile, Vattenfall and Fred. Olsen Seawind are now also collecting wind resource and oceanographic and meteorological data for the project, after recently deploying a floating LiDAR.

The metocean campaign will run for a minimum period of twelve months to inform the project’s engineering works, with instrumentation distributed across two separate mooring systems.

Fred. Olsen Seawind and Vattenfall won the rights to develop the offshore wind farm site, located 67 kilometres off the Scottish east coast, in the ScotWind seabed leasing round last year.

That same year, the developers awarded over GBP 3 million in development contracts with Scottish and UK-based suppliers.

Fred. Olsen Seawind and Vattenfall plan for the Muir Mhòr (initially named Mara Mhòr) floating wind farm to have a capacity of up to 798 MW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindSubseaSurveys & InterventionsWind FarmsBusiness Developments & ProjectsResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free