Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Production from Brazilian FPSO halted once again
Fossil Energy

July 5, 2023 · about 3 years ago

Production from Brazilian FPSO halted once again

Enauta has temporarily interrupted production from a field located offshore Brazil only days after completing the preventive maintenance.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta has temporarily interrupted production from a field located offshore Brazil only days after completing the preventive maintenance activities for a floating, production, storage, and offloading (FPSO) vessel, which is carrying out operations on this field.

Enauta started preventive maintenance at the FPSO Petrojarl I in May 2023 and the production at the Atlanta field was expected to resume in mid-June, with the resumption of production of the wells 7-ATL-4HB-RJS (4HB) and 7-ATL-5H-RJS (5H). The field came back online at the end of June, following the conclusion of the preventive maintenance at the FPSO.

After resuming operations, new tests were performed to identify the causes of repetitive failures in the subsea pumping equipment adopted for Atlanta’s Early Production System (EPS). Come July 2023, the Brazilian player identified that occurrences were concentrated in the subsea pumping electrical system and temporarily halted Atlanta’s production.

According to Enauta, preventive and corrective measures were already anticipated with suppliers and partners. As a result of this, Atlanta’s production is expected to resume by early September 2023. As the company bought the FPSO OSX-2 for Atlanta’s Full Development System (FDS) last year, this FPSO, known as the FPSO Atlanta will replace the FPSO Petrojarl I.

The company claims that the implementation of the FPSO Atlanta and its Definitive Production System advances on schedule with the first oil expected by mid-2024. The FDS is expected to go online originally with six wells in mid-2024, reaching ten wells in 2029 .

“By the third quarter, several important milestones should attest to the near conclusion schedule of the FPSO Atlanta and the conclusion of Phase I’s six production wells campaign. The Definitive Production System has over 98 per cent of its items contracted including the permanent subsea pumping modules at state-of-the-art technology with a superior track record,” explained Enauta.

Located in block BS-4 in the Santos Basin , at a 1,500-metre water depth, the Atlanta field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which also has a 100 per cent interest in this asset. The field has been producing since 2018.

Based on Enauta’s data, its total production in Brazil reached 281.8 thousand barrels of oil equivalent (boe) in June 2023, or average daily production of 9,400 boe. During 2023, the average daily production was 15,300 boe, including oil and gas.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free