Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›NKT preferred bidder for two Scottish offshore HVDC transmission links
Business & Finance

July 21, 2023 · about 3 years ago

NKT preferred bidder for two Scottish offshore HVDC transmission links

SSEN Transmission, the transmission owner in the north of Scotland, has appointed NKT as the preferred bidder for the supply of power cable systems for two HVDC transmission links offshore Scotland. If confirmed, NKT will provide 525 kV XLPE HVDC power cable systems for the Western Isles and Spittal

2 minutes read
  • LinkedIn
  • X
  • Email
NKT preferred bidder for two Scottish HVDC power cable projects

SSEN Transmission, the transmission owner in the north of Scotland, has appointed NKT as the preferred bidder for the supply of power cable systems for two HVDC transmission links offshore Scotland.

If confirmed, NKT will provide 525 kV XLPE HVDC power cable systems for the Western Isles and Spittal-Peterhead offshore HVDC transmission links.

“Reaching preferred bidder status with NKT for the Western Isles and Spittal-Peterhead HVDC cable systems is a hugely important step to support the timely delivery of these projects. We look forward to building on our long-established and strong working relationship with NKT,” said SSEN Transmission Managing Director Rob McDonald .

The parties are now proceeding with the negotiations with the intention of entering into a capacity reservation agreement providing NKT with the securities needed to reserve capacity for the projects.

Subsequently, contracts are expected to be awarded, as well as an intended framework agreement for future projects, NKT said.

“We are very excited to be selected as the preferred bidder by SSEN Transmission for these two Scottish HVDC transmission links. This appointment is an opportunity to further strengthen the excellent collaboration that has been cultivated between the parties with the Caithness-Moray HVDC Link, and the ongoing Shetland HVDC Link,” said NKT President and CEO Claes Westerlind .

The Western Isles and Spittal-Peterhead offshore HVDC transmission links are part of The Pathway to 2030 Holistic Network Design (HND) which is a major upgrade of the electricity transmission network across Great Britain that is required to help meet UK and Scottish Governments 2030 renewable energy and climate change targets.

HND is said to set out a single, integrated design that supports the large-scale delivery of electricity generated from offshore wind.

At the end of 2022, Ofgem approved the strategic electricity transmission reinforcements required to deliver the UK Government’s 50 GW offshore wind by 2030 target – a decision confirming that all SSEN Transmission projects identified by the Electricity System Operator (ESO) as required to meet 2030 offshore wind targets will be taken forward.

Speaking about recent news coming from NKT, the company revealed a couple of months ago that it was planning to boost its high-voltage power cable business with a €1 billion investment in a new factory in Sweden and a power cable vessel.

SUBSCRIBE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersRegulation & PolicyTransitionVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago