Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Subsea upgrade on the agenda for Equinor’s Norwegian Sea duo
Deepwater Installation

August 10, 2023 · about 3 years ago

Subsea upgrade on the agenda for Equinor’s Norwegian Sea duo

Norway’s state-owned energy giant Equinor has received consent from the Petroleum Safety Authority (PSA) to use upgraded subsea compression facilities on two fields located in the Norwegian Sea. PSA reported on 9 August that it had given its approval to Equinor to use upgraded subsea compression fac

2 minutes read
  • LinkedIn
  • X
  • Email
Subsea upgrade on the agenda for Equinor's Norwegian Sea duo
Åsgard. Source: Norwegian Petroleum

Norway’s state-owned energy giant Equinor has received consent from the Petroleum Safety Authority (PSA) to use upgraded subsea compression facilities on two fields located in the Norwegian Sea.

PSA reported on 9 August that it had given its approval to Equinor to use upgraded subsea compression facilities on the Åsgard and Mikkel fields. The move comes shortly after the Norwegian offshore safety regulator gave consent for a “major” modification in connection with a semi-submersible floating platform on the Åsgard field.

Related Articles

Fossil Energy

‘Major’ modification work at Norwegian offshore platform is a go

2 min read

Åsgard , discovered in 1981, is located in the central part of the Norwegian Sea in a water depth of 240-300 meters. The plan for development and operation (PDO) was approved in 1996.

The field has been developed with subsea wells tied back to the production, storage and offloading vessel (FPSO) Åsgard A. The development also includes Åsgard B, a floating, semi-submersible facility for gas and condensate processing. The gas center is connected to a storage vessel for condensate, Åsgard C. Production from Åsgard A began in 1999, while Åsgard B and C came on stream in 2000.

Mikkel is located in the eastern part of the Norwegian Sea, 30 kilometers north of the Draugen field in a water depth of 220 meters. The field was discovered in 1987, and the PDO was approved in 2001, with production starting in 2003. The field is developed with two subsea templates tied back to the Åsgard B facility.

In February, the Norwegian Petroleum Directorate (NPD) granted consent for the extended use of the subsea facility on the Mikkel field for another five years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergyOil & GasProduction & ProcessingSubseaBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersRegulation & PolicyRules & Regulation

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free