Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Brazilian FPSO coming back on stream by next month
Business & Finance

September 7, 2023 · about 2 years ago

Brazilian FPSO coming back on stream by next month

Enauta is anticipating the return of production from an FPSO vessel, which is working on a field off Brazil, by October 2023.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta is anticipating the return of production from a floating, production, storage, and offloading (FPSO) vessel, which is working on a field off Brazil, by October 2023. Previously, the production was expected to resume by early September 2023.

Enauta started preventive maintenance at the FPSO Petrojarl I in May 2023 and the production at the Atlanta field was expected to resume in mid-June, with the resumption of production of the wells 7-ATL-4HB-RJS (4HB) and 7-ATL-5H-RJS (5H). The field came back online at the end of June, following the conclusion of the preventive maintenance at the FPSO.

After resuming operations, new tests were performed to identify the causes of repetitive failures in the subsea pumping equipment adopted for the field’s Early Production System (EPS). Come July 2023, the Brazilian player identified that occurrences were concentrated in the subsea pumping electrical system and temporarily halted the Atlanta field’s production.

According to the Brazilian firm, commissioning and tests of new components were performed in August, opting for the installation of equipment employed in the U.S. Gulf of Mexico and in Brazil due to its track record. As a result, the company expects production to resume by October 2023.

As the company bought the FPSO OSX-2 for Atlanta’s Full Development System (FDS) last year, this FPSO, known as the FPSO Atlanta , will replace the FPSO Petrojarl I. Enauta explains that over 99 per cent of the project items are contracted, including new robust subsea pumping modules.

This month, the company intends to conclude the final production well from the group of six wells in Atlanta’s Phase I and will begin the anchoring of the FPSO Atlanta with the installation of the platform’s spread mooring. The FPSO’s first oil maintains strong alignment with its physical and financial schedule for mid-2024 originally with six wells , reaching ten wells in 2029 .

Located in block BS-4 in the Santos Basin , at a 1,500-metre water depth, the Atlanta field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which also has a 100 per cent interest in this asset. The field has been producing since 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago