Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Leask Marine drills a ‘first’ for tidal developer
Business Developments & Projects

December 22, 2023 · about 2 years ago

Leask Marine drills a ‘first’ for tidal developer

Leask Marine has installed the first offshore grouted pile with its Raptor Submersible Drilling Rig (SDR) technology in the Faroe Islands, for a Swedish tidal developer. This marks the final commercialization phase of the Raptor SDR, from concept, design, manufacturing, and full testing program comp

2 minutes read
  • LinkedIn
  • X
  • Email
Leask Marine drills a ‘first’ for tidal developer

Leask Marine has installed the first offshore grouted pile with its Raptor Submersible Drilling Rig (SDR) technology in the Faroe Islands, for a Swedish tidal developer.

This marks the final commercialization phase of the Raptor SDR, from concept, design, manufacturing, and full testing program complete with third-party verification, Leask Marine said.

The Raptor SDR has now installed a subsea anchor with a diameter of over 980mm weighing 12 tonnes, at a water depth of more than 80 meters in basalt rock.

The unit includes hydraulic stabilizers and its independent leveling systems, once reaching the seabed, allowing the Raptor SDR to install anchors in a single deployment in tidal currents up to 6 knots, Leask Marine said.

The SDR was launched from the Leask Marine multicat vessel MV C-Force using the company’s in-house Launch & Recovery Skid system and the vessel’s 55-ton A-Frame.

The Leask team was supported during the drilling operations by a team of specialist borehole drillers from Welltherm Drilling.

The project was led from its inception by Leask Marine’s Operations Director, Oliver Bethwaite, who was supported by Elsa Ramirez, Leask Marine’s Lead Project Engineer.

While the SDR was primarily designed and developed to operate in the most extreme sea conditions as a solution for tidal and wave clients, this drilling technology holds potential for the offshore wind, offshore solar, hydrokinetic, and aquaculture markets, Leask Marine said.

In addition, it has already proved itself successful at core sampling for offshore site investigation. Earlier this year the team managed to recover a 4.5-meter length rock core sample in a single drilled length. This custom-made length surpasses conventional standards, unlocking a new frontier for scientific investigation and geological analysis, according to the company.

Using this technology is also said to offer the market a substantially lower carbon footprint solution and reduce installation costs as developers move into multiple device arrays.

Douglas Leask , Managing Director of Leask Marine, said: ”This is a huge achievement for its first outing, drilling such a large size of pile, at over 80 meters water depth, on a tidal site. I am extremely proud of our team and once again the Leask team exemplifies why Orkney remains a world leader in the marine renewable energy sector in its experience and technical knowledge that is exported across the globe.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovationTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago