Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Alternative Fuels›NYK orders MAN ES engines for four LNG carriers
Alternative Fuels

January 9, 2024 · about 2 years ago

NYK orders MAN ES engines for four LNG carriers

Japanese shipping company Nippon Yusen Kaisha (NYK) has ordered eight MAN B&W ME-GA engines from German manufacturer MAN Energy Solutions (MAN ES) for four 174,000 cubic meter LNG carriers. According to MAN ES, the order entails 4x2x5G70ME-GA Mk. 10.5 engines which will feature its proprietary exhau

2 minutes read
  • LinkedIn
  • X
  • Email
NYK orders MAN ES engines for four LNG carriers
Illustration; Credit: NYK Line

Japanese shipping company Nippon Yusen Kaisha (NYK) has ordered eight MAN B&W ME-GA engines from German manufacturer MAN Energy Solutions (MAN ES) for four 174,000 cubic meter LNG carriers.

According to MAN ES, the order entails 4x2x5G70ME-GA Mk. 10.5 engines which will feature its proprietary exhaust gas recirculation bypass (EGRBP) emissions-reduction technology.

NYK has four 174,000 cubic meter LNG carriers under construction at HD Hyundai Heavy Industries Co. in South Korea. The vessels are due to be completed in sequence during 2027. The ships will measure 289.9 meters in length, with a breadth of 46.1 meters.

In addition to ME-GA engines, the LNG carriers will also feature a shaft generator and air lubrication system (ALS), which will make them more environmentally friendly than conventional LNG carriers, according to NYK.

Bjarne Foldager , Head of Two-Stroke Business, MAN Energy Solutions, commented on the order from NYK: “We developed this engine for easy application to most contemporary LNG carrier designs and, indeed, all ME-GA orders to date have been exclusively for this segment. Demand for the engine has been continuously strong since its introduction, especially due to its accompaniment by our self-developed EGR system that comes proven by more than a decade of in-service, operational experience and optimisation.”

Thomas S. Hansen , Head of Promotion and Customer Support, MAN Energy Solutions, added that this is the first order from NYK and that the company received more than 278 ME-GA engine orders since May 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Alternative FuelsClean FuelGreen MarineLNGOther FuelsShipbuildingBusiness Developments & ProjectsEquipmentInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free