Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›NKT performs remediation work at 12-year-old Irish Sea interconnector
Business & Finance

May 14, 2024 · about 2 years ago

NKT performs remediation work at 12-year-old Irish Sea interconnector

Denmark’s NKT has completed inspection survey and remediation work on an interconnector that has been linking the electricity transmission grids of Ireland and Great Britain for twelve years. The specialized inspection and remediation work on the East West HVDC interconnector (EWIC) allows the owner

2 minutes read
  • LinkedIn
  • X
  • Email
NKT performs remediation work at 12-year-old Irish Sea interconnector

Denmark’s NKT has completed inspection survey and remediation work on an interconnector that has been linking the electricity transmission grids of Ireland and Great Britain for twelve years.

The specialized inspection and remediation work on the East West HVDC interconnector (EWIC) allows the owner EirGrid Interconnector Designated Activity Company (EIDAC), a subsidiary of Irish transmission system operator (TSO) EirGrid Group, to ensure that the cable is brought back to optimal conditions.

“We are pleased to announce that both the inspection survey and remediation work following the survey are now successfully completed. The inspection survey led to remediation work being done for EIDAC, using our vessel NKT Victoria,” said Axel Barnekow Widmark , Executive Vice President, Service at NKT.

“EIDAC is a long-standing partner to NKT, and the long-term service agreement is a testament to the strong collaboration between our companies to jointly optimize performance of their interconnector.”

According to NKT, conducting periodic cable inspection surveys ensures that the cable can withstand extreme conditions and perform safe operations.

The survey of the East West interconnector, including characterization of seabed conditions along the cable, led to concrete mattresses and rock bags being placed above exposed sections. The work is part of a long-term service agreement between the two companies.

“As the interconnector is a critical piece of infrastructure between Ireland and Great Britain it is essential that it is maintained in an optimal condition. The recent survey showed the necessity of remediation work on sections of the cable. These works are now complete ensuring the continuity of supply between Ireland and Great Britain,” said EirGrid’s Chief Operations Officer Rodney Doyle .

EWIC, which has a power rating of 500 MW, links the electricity transmission grids of Ireland and Great Britain from converter stations at Portan in Ireland to Shotton in Wales.

The interconnector is 262 kilometers long, 186 kilometers of which is beneath the Irish Sea, and has been in commercial operation since December 2012.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsInfrastructureOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago