Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Italy’s FSRU embarks on final stage of maintenance works in Marseille
Business & Finance

June 5, 2024 · about 2 years ago

Italy’s FSRU embarks on final stage of maintenance works in Marseille

OLT Offshore LNG Toscana has confirmed the start of the second and final phase of maintenance activities for its FSRU.

2 minutes read
  • LinkedIn
  • X
  • Email
FSRU Toscana; Source: OLT Offshore LNG Toscana

Italy’s floating regasification terminal operator OLT Offshore LNG Toscana, controlled by Snam and Igneo Infrastructure Partners, has confirmed the start of the second and final phase of maintenance activities for its floating storage and regasification unit (FSRU), which will go back to its post off the coast of Livorno afterward.

After the FSRU Toscana was unhooked, two tugs assisted in towing the FSRU to the port of Genoa , where it was expected to remain at the dock for about a month to start the first phase of the extraordinary maintenance intervention.

According to OLT Offshore LNG Toscana, the FSRU Toscana has completed the first maintenance phase on schedule and left Genoa for Marseille to begin the second phase, thanks to a contract with San Giorgio del Porto (SGdP).

The FSRU has been towed, with the support of three tugs, to the port of Marseille, where the extraordinary maintenance operations aimed at replacing the bearing of the anchoring system will be wrapped up.

The operator explains that this system is designed and built to ensure the rotation of the terminal around the geostationary turret permanently anchored to the seabed. These shipyard activities are anticipated to be over by mid-September when operations to re-install the FSRU at its designated site offshore Livorno will kick off. This unit is due to resume operations from mid-October 2024.

Once it comes back online, the FSRU Toscana, moored about 22 km off the coast between Livorno and Pisa, will be once again connected to the national grid through a 36.5 km long pipeline, operated and managed by Snam, of which about 29.5 km is at sea, 5 km in the floodway and the remaining 2 km on dry land.

The FSRU Toscana has a maximum authorized regasification capacity of 5 billion Sm3 a year, after a green light to boost annual regasification capacity from 3.75 billion to about 5 billion standard cubic meters per year was given in May 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenancePorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago