Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Hudong-Zhonghua: 14,000 cbm LNG bunkering ship wraps up gas trials
Business Developments & Projects

June 7, 2024 · about 2 years ago

Hudong-Zhonghua: 14,000 cbm LNG bunkering ship wraps up gas trials

The 14,000 cbm LNG bunkering vessel custom-built by Hudong-Zhonghua for Anhui Changjiang LNG has completed gas trials.

1 minutes read
  • LinkedIn
  • X
  • Email
Hudong-Zhonghua: 14,000 cbm LNG bunkering ship wraps up gas trials

The 14,000 cubic meter (cbm) LNG bunkering vessel custom-built by Chinese shipbuilder Hudong-Zhonghua, a subsidiary of China State Shipbuilding Corporation (CSSC), for compatriot Anhui Changjiang LNG, an operator of the Wuhu LNG Terminal in Anhui Province, has completed gas trials.

The LNG bunkering vessel was ordered in 2022 as part of the Gasification of the Yangtze River strategy, aiming to switch ships sailing the river by burning heavy oil and diesel to use LNG and thus cut emissions.

Hudong-Zhonghua held a launching ceremony for the vessel in January 2024 . With gas trials completed and the ship docked at the Changxing No. 0 base wharf, the shipbuilder marks another milestone in LNG ship design and construction.

Classified by the China Classification Society (CCS), the ship has a total length of 130 meters, a molded width of 23.60 meters, and a molded depth of 15 meters.

It features a B-type containment system independently designed by Hudong-Zhonghua as well as the capability to provide both LNG refueling and transportation services from river to sea.

In addition, the ship carries a dozen types of equipment that are first applied on board, including the first domestic LD compressor, cryogenic pump, and deep-cold device, with a localization rate of more than 80%, the shipbuilder highlighted.

The delivery of the LNG bunkering vessel is scheduled for August this year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsGreen MarineInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago