Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hydrogen infrastructure in Germany receives financial backing
Business & Finance

June 18, 2024 · about 2 years ago

Hydrogen infrastructure in Germany receives financial backing

Bayernets is investing €210 million in the energy infrastructure in Germany, specifically a pipeline expected to meet the basic requirements for the transportation of hydrogen.

2 minutes read
  • LinkedIn
  • X
  • Email
Hydrogen infrastructure in Germany receives financial backing

Transmission system operator (TSO) bayernets is investing €210 million in the energy infrastructure in southern Germany, specifically a gas pipeline expected to meet the basic requirements for the transportation of hydrogen. KfW IPEX-Bank, Commerzbank and DZ Bank are each contributing a third of the sum.

KfW IPEX-Bank said that the investments will be used for the construction of the 40.5 kilometer-long gas pipeline, AUGUSTA, which will connect the Wertingen network node in the district of Dillingen an der Donau, located on the Danube, to the Kötz network node in the district of Günzburg.

“Right from the outset, the pipeline will meet the basic requirements for the transportation of hydrogen, which will flow through the pipeline in the medium and long term,” KfW claimed.

Andreas Ufer, Member of the Management Board of KfW IPEX-Bank, commented: “The AUGUSTA pipeline is an important step in securing the energy supply in Bavaria and Baden-Württemberg in the long term and will enable the transportation of hydrogen in the future. We are proud that our financing will contribute to the decarbonisation of industrial centres in southern Germany and, in turn, to maintaining Germany a strong industrial location.”

To note, AUGUSTA will be linked to the planned SoutH2 Corridor, a hydrogen pipeline initiative led by European TSOs and identified as a Project of Common Interest (PCI) by the European Union (EU).

From 2030, green hydrogen will be transported from Algeria and Tunisia in North Africa to the Austrian-German border point at Burghausen via this conductor and then distributed in Germany via HyPipe Bavaria.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsCollaborationInfrastructureOutlook & StrategyProject & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago