Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Preparatory ops for offshore installation of French-Irish interconnector about to begin
Cabling

June 27, 2024 · about 2 years ago

Preparatory ops for offshore installation of French-Irish interconnector about to begin

Greece’s Asso.subsea is set to begin boulder clearance and trenching next month for the interconnector that will link the power systems of Ireland and France together for the first time via subsea power cable. It was reported in May that Asso.subsea had joined forces with French cable maker Nexans t

1 minutes read
  • LinkedIn
  • X
  • Email
Preparatory ops for offshore installation of French-Irish interconnector about to begin
Source: Asso.subsea

Greece’s Asso.subsea is set to begin boulder clearance and trenching next month for the interconnector that will link the power systems of Ireland and France together for the first time via subsea power cable.

It was reported in May that Asso.subsea had joined forces with French cable maker Nexans to perform subsea burial operations for the Celtic Interconnector.

The Greek company will perform boulder clearance with the use of a grapple, and trenching of the seabed with the use of a plough starting from July, until November. Trenching support vessel Aethra is engaged on the project.

Subsequent campaigns are planned for 2025 and 2026, focusing on post-trenching operations.

The Celtic Interconnector is being developed by the Irish transmission system operator (TSO) EirGrid and its French counterpart Réseau de Transport d’Electricité (RTE).

Nexans, which won the contract for the project in 2022, kicked off the installation of high-voltage alternating current (HVAC) onshore cable on the Irish side of the interconnector in May. Offshore cable installation work is slated to begin next year .

Siemens Energy is delivering the HVDC transmission technology.

When complete in 2026, the 700 MW 320 kV VSC HVDC link will allow the movement of enough electricity to power 450,000 homes.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingInterconnectorsSubseaBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free