Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›LNG project offshore Mozambique one step shy of FID
Fossil Energy

August 30, 2024 · about 2 years ago

LNG project offshore Mozambique one step shy of FID

The operator of a deepwater block off the coast of Mozambique, Mozambique Rovuma Venture (MRV), comprising ExxonMobil, Eni, and China National Petroleum Corporation (CNPC), has taken the last step before making a final investment decision (FID) by inking front-end engineering design (FEED) contracts

2 minutes read
  • LinkedIn
  • X
  • Email
Artist’s rendering of the LNG terminal
Artist’s rendering of the LNG terminal; Source: Eni

The operator of a deepwater block off the coast of Mozambique, Mozambique Rovuma Venture (MRV), comprising ExxonMobil, Eni, and China National Petroleum Corporation (CNPC), has taken the last step before making a final investment decision (FID) by inking front-end engineering design (FEED) contracts enabling potential contractors to compete for the engineering, procurement, and construction (EPC) of the country’s proposed liquefied natural gas (LNG) project.

The final move made for the Area 4 block exploration and production concession contract before FID is expected to last around 16 months. The concession within the Rovuma supergiant gas basin encompasses the operational Coral Sul FLNG facility, which Technip delivered to Eni in January , the planned Coral North FLNG development, and the Rovuma LNG onshore facilities, with the last two both expected to be sanctioned during 2024/25.

Frank Kretschmer, President of ExxonMobil Mozambique, noted: “The award and execution of the FEED contracts is a meaningful step forward to developing the world-class Rovuma LNG project. We will continue to work with the Government to maximize the long-term benefits this project will bring to the people of Mozambique.”

The Coral South development can produce up to 3.5 million tonnes per annum (mtpa) of LNG, the same as the proposed Coral North development is expected to do. On the other hand, the 18-mtpa Rovuma onshore LNG development will have a modular, electric-drive design, with 12 1.5 mtpa modules fabricated offsite and assembled at Afungi, Mozambique. In addition to reducing on-site presence and execution risks, the design is projected to reduce GHG emissions during liquefaction.

Based on ExxonMobil’s estimates, the Area 4 block contains approximately 85 trillion gross cubic feet of natural gas. MRV holds a 70% interest in the concession, and 10% interests are held by KOGAS , Empresa Nacional de Hidrocarbonetos (ENH) , and, as of recently, ADNOC , after it inked a deal to acquire Galp’s 10% interest in May.

Related Articles

Fossil Energy

ADNOC widens its global LNG arsenal by joining Eni’s Coral Sul FLNG project

3 min read

Apart from LNG, the UAE giant has been exploring carbon capture and storage (CCS) opportunities. The firm recently signed a joint study and development agreement (JSDA) with Petronas and Storegga to look into the CO2 emissions storage capabilities of saline aquifers and the construction of CCS facilities offshore Peninsular Malaysia.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyLiquefied Natural GasOil & GasBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free