Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Aker Solutions ready for work on another chapter in giant North Sea gas project’s story
Fossil Energy

September 30, 2024 · about 1 year ago

Aker Solutions ready for work on another chapter in giant North Sea gas project’s story

Aker Solutions has been hired for topside modification assignment at a project that aims to bolster gas production from a giant oil and natural gas field in the northern part of the North Sea, which Equinor operates on the Norwegian Continental Shelf (NCS).

3 minutes read
  • LinkedIn
  • X
  • Email
Troll A platform; Credit: Øyvind Gravås and Even Kleppa/Equinor
Troll A platform on the NCS; Credit: Øyvind Gravås and Even Kleppa/Equinor

Norway-based energy services provider Aker Solutions has been hired for topside modification assignment at a project that aims to bolster gas production from a giant oil and natural gas field in the northern part of the North Sea, which Equinor, a Norwegian state-owned energy giant, operates on the Norwegian Continental Shelf (NCS).

Thanks to this new contract, starting right away and worth between NOK 0.5 billion (about $47.58 million) and NOK 1.5 billion (close to $142.8 million), Aker Solutions will handle the engineering, procurement, construction, installation, and commissioning (EPCIC) work for the topside modification of the Troll A platform to accelerate production from the Troll West gas reservoir, as part of the second stage of the Troll Phase 3 (TP3 II) project. The work is scheduled for completion at the end of 2027.

Considered to be Norway’s largest gas field, Troll is said to supply 10% of Europe’s gas needs. The Norwegian firm’s job related to preparing the Troll A platform for receiving and processing gas from eight new wells at Troll West is not the only task it has been entrusted with, since it is also in charge of preparing and installing equipment for the clean-up of the initial well fluids during the start-up of the wells.

Paal Eikeseth , Executive Vice-president and Head of Aker Solutions’ Life Cycle segment, commented: “We are excited to continue following the significant development of the giant Troll field and to move forward with the next step of Troll Phase 3. In-depth knowledge of Troll A, the equipment on the asset, and the modifications made in the first phase is essential, providing a strong foundation for executing this new scope.”

Located in the North Sea, 80 km northwest of Bergen, the Troll field’s first stage was completed in 2021 with a new module on the Troll A platform to receive and process gas from the Troll West field. Aker Solutions, which completed the Troll A topside modification and provided the subsea systems for the field development in the first stage, is currently electrifying Troll West for the future, and also handles maintenance work on the platforms.

Troll Phase 3 involves producing the gas cap overlying the oil column in Troll West while continuing oil production, as the produced gas goes to Troll A and onwards to the existing infrastructure. Aker Solutions office in Stavanger with support from Bergen and Mumbai will take care of project management, detail engineering, procurement, and shop engineering.

On the other hand, the construction and prefabrication will be executed at the company’s yard in Egersund. OneSubsea , in which Aker Solutions owns a 20% stake, is also working on the same project to tackle the subsea production system.

Related Articles

Deepwater Installation

SLB, Subsea7, and Aker Solutions’ JV finds work on $1 billion North Sea gas project

2 min read

“We will have the lead responsibility for the interfaces between contractors in this project and will leverage our experience as integrators in complex energy projects, focusing on delivering high-value and optimized solutions. We are honored to be a trusted contractor and look forward to continuing the close collaboration with Equinor on Troll,” highlighted Eikeseth.

The job on Troll’s next phase comes a few months after Aker Solutions secured a multi-year contract win with Azule Energy to provide brownfield maintenance and modification scopes for two floating production storage and offloading (FPSO) vessels in Angola.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free