Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›First LNG cargo from floating terminal offshore Mexico sets sail for Europe (Video)
Fossil Energy

October 1, 2024 · about 1 year ago

First LNG cargo from floating terminal offshore Mexico sets sail for Europe (Video)

U.S. energy infrastructure player New Fortress Energy (NFE) has reached another milestone at its floating liquefied natural gas (FLNG) unit off the coast of Altamira, Mexico with first full cargo and sail away.

2 minutes read
  • LinkedIn
  • X
  • Email
Two large vessels at sea surrounded by four smaller ones
FE Penguin and Energos Princes; Source: New Fortress Energy

U.S. energy infrastructure player New Fortress Energy (NFE) has reached another milestone at its floating liquefied natural gas (FLNG) unit off the coast of Altamira, Mexico with first full cargo and sail away.

NFE’s first Fast LNG (FLNG) asset, FLNG 1 – comprising three repurposed jack-up rigs off the coast of Altamira – has had its first full LNG cargo fully loaded onto the Energos Princess , which has set sail for Europe. This comes less than two months after completing the first cargo load and sail operation .

“This is a significant milestone for our Fast LNG installation. Natural gas and power supply are critical components of a sustainable, affordable, and cleaner energy system and we’re excited to be able to provide our own gas supply to the world markets and our customers,” said Wes Edens , Chairman and CEO of New Fortress Energy.

Boasting a capacity of 1.4 million tons per annum (mtpa), the FLNG 1 asset is described as “the fastest large-scale LNG project ever developed.” It is expected to help create a new FLNG hub off the east coast of Mexico.

This content is available after accepting the cookies.

The project recently received approval from the United States Department of Energy (DOE) to export LNG from the inaugural installation to non-free trade agreement countries for a term of five years, and secured a loan to build the second installation, FLNG 2 . The construction works for the second unit are slated to be completed in the first half of 2026.

Related Articles

Fossil Energy

With first FLNG unit online, US player gets hold of $700 million loan to build second one

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyLiquefied Natural GasOil & GasBusiness & FinanceBusiness Developments & ProjectsVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free