Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Verdagy opens gigawatt-scale electrolyzer facility in US
Business Developments & Projects

October 28, 2024 · about 1 year ago

Verdagy opens gigawatt-scale electrolyzer facility in US

U.S. renewable hydrogen electrolysis company Verdagy has opened a gigawatt-scale electrolyzer manufacturing facility in Newark, California.

2 minutes read
  • LinkedIn
  • X
  • Email
Verdagy opens gigawatt-scale electrolyzer facility in US

U.S. renewable hydrogen electrolysis company Verdagy has opened a gigawatt-scale electrolyzer manufacturing facility in Newark, California.

The factory, said to be the first Department of Energy (DOE)-supported electrolyzer facility to open in the U.S., features more than 100,000 square feet of manufacturing space with the capacity to produce several gigawatts of electrolyzers.

Verdagy revealed that the company’s manufacturing strategy is to reduce electrolyzer stack costs by implementing advanced manufacturing automations, a product designed for low cost and high reliability and integration of a domestic nickel alloy to a high-volume, automated manufacturing line.

“This manufacturing strategy allows Verdagy to add gigawatts of capacity at costs that are five times lower than that of competitors, enabling massive, financially prudent scaling of capacity. The company also has the advantage of being nimble and flexible to quickly adjust roadmaps, without conflicts from competing incumbent businesses,” the company claimed.

Verdagy’s manufacturing process will start with ATI company’s metal coils and output finished electrolyzer cells by vertically integrating subassemblies with minimal manual handling and processing. The two parties coined this electrolyzer manufacturing process as “coils-to-cells.”

To note, Verdagy’s gigawatt-scale factory was announced in 2023 and awarded a $39.6 million grant by the DOE in March 2024 to accelerate the high-volume manufacturing of advanced alkaline water electrolysis (AWE) eDynamic electrolyzers. The production is set to begin in the first quarter of 2025.

At the beginning of 2024, energy major Shell technically approved Verdagy’s 20 MW eDynamic electrolyzers after completing a HAZOP (safety) review as well as a design and technology development assessment.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsExploration & ProductionTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago