Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›VARD-built cable layer destined for Danish subsea specialist prepping for sea trials
Cabling

November 11, 2024 · about 1 year ago

VARD-built cable layer destined for Danish subsea specialist prepping for sea trials

Denmark’s subsea specialist NCT Offshore is planning to carry out sea trials for its new cable-laying vessel (CLV) constructed by Norway’s ship designer and shipbuilder VARD later this month. NCT placed the order for the 95-meter-long CLV Freja with VARD in early 2023, with Vard Design in Ålesund, N

1 minutes read
  • LinkedIn
  • X
  • Email
VARD-built cable layer destined for Danish subsea specialist prepping for sea trials
Source: NCT Offshore

Denmark’s subsea specialist NCT Offshore is planning to carry out sea trials for its new cable-laying vessel (CLV) constructed by Norway’s ship designer and shipbuilder VARD later this month.

NCT placed the order for the 95-meter-long CLV Freja with VARD in early 2023, with Vard Design in Ålesund, Norway, in charge of the design, Vard Tulcea in Romania building the hull, and final outfitting, commissioning and delivery to be carried out by one of the company’s shipyards in Norway.

VARD reported on July 9 that it had launched the new build 962 at Vard Shipyards in Tulcea, after which the vessel made its way to Norway from Romania.

Related Articles

Subsea

New cable-laying vessel reaches Norway to undergo final works

2 min read

According to NCT, Freja was moved from the Vard Langsten covered enclosure to the outfitting quayside last week, in preparation for the mobilization of the 10t SWL main crane and the final top mast section

Sea trials are planned later in November, after which the final outfitting and commissioning activities will be completed.

The CLV will be capable of providing turnkey array cable transport and installation scopes of work for the offshore renewable industry, NCT said. It will be a diesel-electric DP2 vessel , fitted with a hybrid battery package, single-cabin accommodation for 60 persons, two cable carousels with 3.500+ ton cable carrying capacity, and an innovative walk-to-work system.

Follow Offshore Energy’s Subsea on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingClean FuelElectricGridOffshore WindSubseaVesselsVessels & VehiclesBusiness & FinanceBusiness Developments & ProjectsGreen MarineOutlook & StrategyProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free