Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Allseas waves goodbye to shallow-water pipelay barge after 27 years
Business & Finance

November 18, 2024 · about 1 year ago

Allseas waves goodbye to shallow-water pipelay barge after 27 years

Dutch offshore contractor Allseas is bidding farewell to a shallow-water pipelay barge it purchased in 1997, after having installed over 400 kilometers of nearshore pipeline across the world. Allseas has sold its 154-meter-long Tog Mor barge for repurpose after it ran aground in Mexico in September

1 minutes read
  • LinkedIn
  • X
  • Email
Allseas waves goodbye to shallow-water pipelay barge after 27 years

Dutch offshore contractor Allseas is bidding farewell to a shallow-water pipelay barge it purchased in 1997, after having installed over 400 kilometers of nearshore pipeline across the world.

Allseas has sold its 154-meter-long Tog Mor barge for repurpose after it ran aground in Mexico in September while seeking shelter.

Built in 1975 as a heavy-duty floating derrick, Tog Mor, meaning “big lift” in Gaelic, was designed with Stülcken masts for the assembly of large sections and modules for offshore production platforms. Its legacy began with the construction of the North Sea’s Maureen platform.

Allseas purchased the barge in 1997, which was then converted for pipelay and construction activities between 2001 and 2002. The barge debuted for Allseas on the Interconnector Scotland-Ireland pipeline, after which it installed more than 400 kilometers of nearshore pipeline worldwide.

The flat-bottom, anchored barge for shallow water offshore construction activities is equipped with a 10-point mooring system, pipelay equipment suitable for laying pipe up to 60 inches in diameter, and a piggyback firing line for a 6.50-inch diameter pipe. It is also fitted with a davit system that enables the performance of midpoint tie-ins and a 300-ton crane for construction work.

According to the company, Tog Mor can lay pipes up to a water depth of 150 meters without modification, while deeper water projects are possible with modification to the winches and stinger. The barge can accommodate 144 persons.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago