Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Australian wave energy device retrieved for scheduled maintenance (Video)
Business Developments & Projects

November 28, 2024 · about 1 year ago

Australian wave energy device retrieved for scheduled maintenance (Video)

The University of Western Australia’s (UWA) Moored MultiModal Multibody (M4) wave energy converter (WEC) has been retrieved for its first scheduled maintenance checks following the initial deployment phase. The M4 WEC was brought into the marina to undergo its first scheduled checks and maintenance

1 minutes read
  • LinkedIn
  • X
  • Email
M4 wave energy converter deployed in King George Sound, Albany.

The University of Western Australia’s (UWA) Moored MultiModal Multibody (M4) wave energy converter (WEC) has been retrieved for its first scheduled maintenance checks following the initial deployment phase.

The M4 WEC was brought into the marina to undergo its first scheduled checks and maintenance tasks as part of its operational plan.

According to the University of Western Australia’s (UWA) Oceans Institute, the M4’s first deployment was “very successful,” with the team expressing gratitude to the collaborative efforts of project partners that contributed to the initial stage’s achievements.

Following the maintenance, the wave energy platform is expected to be redeployed shortly, continuing its role in advancing marine renewable energy research and testing.

Bringing the M4 into the marina

The project, run by UWA’s Marine Energy Research Australia and funded by the Blue Economy CRC and the Western Australian State Government, is part of ongoing research into the Great Southern’s potential as a wave energy hub.

The M4 wave energy device , featuring a triangular forward frame, a trailing arm, and a power generator on the connecting hinge, is built from structural steel beams and four steel floater buoys for buoyancy and ballast.

Just recently, the M4 WEC passed a survival mode test, demonstrating its endurance in harsh offshore conditions.

Earlier in November, the M4 WEC was deployed in King George Sound, Albany , where the device started transmitting performance data, as it beings the six-month test phase.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceProject & TendersTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago