The Demo 1 project is planned to be built in or near the Hollandse Kust Noor offshore wind farm around 2030.
The preferred location for Demo 2 is in the Ten noorden van de Waddeneilanden offshore wind area. The second offshore hydrogen project is planned to be constructed in 2033.
