Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Montrose Port: Work starts on Berth 3 shore power installation
Infrastructure

January 20, 2025 · about 1 year ago

Montrose Port: Work starts on Berth 3 shore power installation

Work is underway to install shore power at Berth 3 at Scottish Montrose Port, with operations set to go live in February 2025.

2 minutes read
  • LinkedIn
  • X
  • Email
Montrose

Work is underway to install shore power at Berth 3 at Scottish Montrose Port, with operations set to go live in February 2025.

Once the installation is complete, 30% of the port’s berths will be electrified , allowing offshore energy support vessels to connect to Plug Montrose, a shore power facility that has been developed in partnership with Norwegian shore power specialist Plug.

Back in late 2022, Montrose Port Authority and Plug Shore Power entered into a 50/50 joint venture to become the first Scottish port to offer shore power to offshore energy vessels.

By connecting to shore power instead of relying on traditional diesel engines to power onboard functions, vessels will be able to significantly reduce emissions while at berth, particularly as the electricity supplied through Plug Montrose comes with a Renewable Energy Guarantee of Origin (REGO).

This initiative is said to be a crucial step in reducing the environmental impact of port operations and supporting the decarbonization of vessel operations.

Plug Montrose has identified numerous benefits of shore power to the maritime sector, including reduced emissions, energy efficiency, improved welfare and sustainability leadership.

In related news, Montrose Port Authority became last year the first port in Scotland to provide a shore power service for offshore energy supply vessels which will greatly reduce harmful emissions, noise pollution and fuel consumption. In May 2024, the port authority said that the shore power facility became operational on berths 1 and 2, following a significant upgrade to the port’s substation and quayside infrastructure carried out by Scottish and Southern Electricity Networks (SSEN).

The inaugural connection to the facility during the testing phase was made by the Norwegian vessel, Magne Viking, from Viking Supply Ships.

READ MORE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructurePorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

13 days ago