Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Stimulation ops underway at Canadian firm’s gas field off Türkiye
Business Developments & Projects

February 14, 2025 · about 1 year ago

Stimulation ops underway at Canadian firm’s gas field off Türkiye

Canada’s oil and gas player Trillion Energy is pressing on with stimulating natural gas production at a field off the coast of Türkiye following weather-induced delays.

2 minutes read
  • LinkedIn
  • X
  • Email
An offshore platform

Canada’s oil and gas player Trillion Energy is pressing on with stimulating natural gas production at a field off the coast of Türkiye following weather-induced delays.

In January 2025 the company completed the installation of new velocity string tubing in two wells located on tripods, Alapli-2 and Bayhanli-2, at the SASB field. This took approximately two weeks to complete.

Starting in October 2024 , new tubing was installed in four wells on the Akçakoca platform. A total of six wells have now received the new smaller tubing size (2 3/8″ as opposed to the previous 4 1/2″) to mitigate water loading conditions.

In a previous update from mid-January , Trillion shared that the nitrogen stimulation for Bayhanli-2 and Alapli-2 was postponed due to severe weather conditions, with plans to resume operations on January 16.

According to a social media update from January 16, nitrogen (N2) tubes were loaded onto the workboat at Akçakoca Port and on their way to the Akkaya tripod, where nitrogen stimulation would be performed on Alapli-2. After that, the crew was to move to the East Ayazli tripod to carry out nitrogen stimulation on Bayhanli-2.

Nitrogen lifting was ongoing on Alapli on the following day . As stated by Trillion, tripod wells continue to receive nitrogen injections to stimulate production, but inclement weather caused several delays over the past few weeks. Furthermore, while Alapli-2 and Bayhanli-2 initially responded positively to the injection, stable long-term flow rates have not yet been achieved.

The Canadian player intends to stimulate the Akçakoca-3 and South Akçakoca-2 wells using nitrogen in the upcoming week, once the weather stabilizes. The company says a gas lift compressor system was sourced for the Akçakoca platform to provide continuous gas lifting injection to certain wells to support production.

Additionally, plans are underway to boost production by installing a progressive cavity pump (PCP) in a well and two slim-hole electric submersible pumps (ESPs) attached to the new tubing in two wells.

As explained by Trillion, these strategic interventions involving artificial lift are critical to sustaining long-term production rates and optimizing well performance. They are expected to take place in the upcoming months.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsExploration & ProductionOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago