Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›HD KSOE wins $312M shipbuilding contract for ethane carrier duo
Green Marine

March 5, 2025 · about 1 year ago

HD KSOE wins $312M shipbuilding contract for ethane carrier duo

South Korean shipbuilding giant HD Korea Shipbuilding & Offshore Engineering (HD KSOE) has bagged a KRW 458.8 billion (around $312 million) order from an undisclosed Asian shipping company to construct two very large ethane carriers (VLECs). It is understood that the two ethane carriers are set to b

2 minutes read
  • LinkedIn
  • X
  • Email
HD KSOE
Illustration; Image by Offshore Energy

South Korean shipbuilding giant HD Korea Shipbuilding & Offshore Engineering (HD KSOE) has bagged a KRW 458.8 billion (around $312 million) order from an undisclosed Asian shipping company to construct two very large ethane carriers (VLECs).

It is understood that the two ethane carriers are set to be built at the HD Hyundai Heavy Industries’ shipyard in Ulsan.

As informed, HD KSOE clinched the contract on February 28, 2025. According to the South Korean player’s stock exchange filing, the two newbuildings are anticipated to be handed over by the end of December, 2028.

In addition to this order, HD Korea Shipbuilding & Offshore Engineering—which has its headquarters in South Korea’s fourth largest city, Seongnam—recently clinched another major contract, this time with French shipping heavyweight CMA CGM.

Specifically, at the end of January this year, the Marseille-based CMA CGM commissioned HD KSOE to construct twelve liquefied natural gas (LNG)-powered dual fuel 18,000 TEU container vessels in a deal estimated at a whopping KRW 3.7 trillion (about $2.57 billion).

As per data from Greek shipbroker Intermodal, the ‘mega’ containerships are also slated for delivery by the end of December 2028.

Related Articles

Clean Fuel

CMA CGM books 12-unit-strong LNG dual-fuel containership fleet at HD KSOE

2 min read

Having concluded 2024 with $20.56 billion in orders, HD KSOE was cited by several local news outlets in early January 2025 as aiming to secure over $18 billion in contracts for the year, with a strategic focus on eco-friendly and high-end vessels.

More recent data from South Korean news outlets, however, indicates that HD KSOE has already won 21 shipbuilding contracts this year, believed to be worth $3.58 billion, which translates to a 19.8% completion of the company’s target for 2025.

Additionally, among the units that HD Korea Shipbuilding & Offshore Engineering is projected to hand over within the next two years are the pair of very large ammonia carriers (VLACs) booked by an undisclosed shipowner from Oceania in October 2024.

The newbuildings—the contract for which is valued at KRW 339.6 billion (about $250 million)—are reportedly going to join their owner’s fleet by the end of September, 2027.

READ MORE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineShipbuildingVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free