Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Solvang: Steel cut for first two of seven Panamax VLGCs
Business Developments & Projects

April 16, 2025 · about 1 year ago

Solvang: Steel cut for first two of seven Panamax VLGCs

Construction of the first two hulls in the Panamax very large gas carrier (VLGC) newbuilding series, owned by Norwegian shipping company Solvang, has begun in Korea.

2 minutes read
  • LinkedIn
  • X
  • Email
Solvang: Steel cut for first two of seven Panamax VLGCs

Construction of the first two hulls in the Panamax very large gas carrier (VLGC) newbuilding series, owned by Norwegian shipping company Solvang, has begun in Korea.

As disclosed, on April 14, 2025, steel was cut for hulls 3458 and 3459 at the shipbuilding company HD Hyundai Heavy Industries’ premises in Ulsan, where all seven ordered newbuildings will be constructed.

It is understood that the newbuildings will have hull ECO lines, and the Solvang ECO package will be fully implemented. The vessels will reportedly be OCCS-ready, set up with the company’s total emission control system comprising low-pressure exhaust gas recirculation, hybrid exhaust gas cleaning, with water treatment in both open and closed loop, and an electrostatic filter (WESP) which is said to remove up to 95% of particles from the exhaust stream.

Solvang said the vessels have one extra deck to provide space for on-deck CO2 tanks, larger auxiliary engine and boiler capacity, as well as extra accommodation for personnel.

Instead of dual-fuel, the newbuildings will be equipped with a single-liquid fuel system, the company noted, adding that given the total emission control capabilities, the setup is suitable for both conventional HFO, low-sulphur fuel oil, MGO, biofuels or e-fuels.

Solvang’s Fleet Director Tor Øyvind Ask stressed: “These vessels are built to comply with radical GHG emission requirements using onboard CSS, they maintain the competitive advantages of efficient conventional fuel operation, or they can operate on zero-emission e-fuels.”

The hulls 3458 and 3459 are both scheduled for delivery in 2026, with a capacity of 88,000 cbm.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago