Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Greece’s largest electricity transmission project starts operating
Authorities & Government

May 26, 2025 · about 1 year ago

Greece’s largest electricity transmission project starts operating

The Crete-Attica electrical interconnection, the largest electricity transmission project in Greece, has officially begun operating, with Crete now fully integrated into the national electricity system. With a budget of over €1.1 billion, the cable link connects the Attica region on the Greek mainla

2 minutes read
  • LinkedIn
  • X
  • Email
Greece’s largest electricity transmission project starts operating

The Crete-Attica electrical interconnection, the largest electricity transmission project in Greece, has officially begun operating, with Crete now fully integrated into the national electricity system.

With a budget of over €1.1 billion, the cable link connects the Attica region on the Greek mainland to the Heraklion area in Crete, thanks to Nexans providing one 500 MW HVDC subsea cable system to form half of the bipole interconnection and Prysmian handling the other half of the interconnection and two subsea telecom links.

Greek transmission system operator (TSO) Independent Power Transmission Operator (IPTO or ADMIE) reported on May 21 that the project’s converter stations had been energized for the first time, as well as reactive power from the converters injected into the electrical systems of Attica and Crete.

The interconnection, constructed by IPTO’s subsidiary Ariadne Interconnection, officially entered into operation on May 24 , with the successful transfer of direct current (DC) electricity.

The trial operation phase is expected to last throughout the summer months.

Greece’s Minister of Environment and Energy Stavros Papastavrou said: “Through this submarine energy bridge, which was constructed rapidly and using the most advanced technology, Crete becomes a central pillar in the country’s energy transition.”

“The operation of the interconnection opens a new chapter for the island’s energy security,” stated Chairman and CEO of IPTO Manos Manousakis .

The project ranks among the three deepest interconnections worldwide and with a capacity of 1,000 MW leads in power transfer capacity for island systems, ensuring energy security for Crete and reducing annual CO2 emissions by 500,000 tons, IPTO noted.

It is co-financed by the Operational Programme “Transport Infrastructure, Environment and Sustainable Development” (NSRF 2014–2020) and the “Environment and Climate Change” program of NSRF 2021–2027, up to the amount of €535.5 million.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersRegulation & PolicyTransitionVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago