Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Seventh FPSO prepares to join Petrobras’ Santos Basin field
Fossil Energy

June 30, 2025 · about 1 year ago

Seventh FPSO prepares to join Petrobras’ Santos Basin field

A sailaway ceremony has been held to mark the departure of a floating production storage and offloading (FPSO) unit from Seatrium’s yard in Singapore to a field offshore Brazil operated by the country’s state-owned energy major Petrobras.

2 minutes read
  • LinkedIn
  • X
  • Email
A stage for a FPSO sailaway ceremony
FPSO P-78 sailaway ceremony; Source: Magda Chambriard via LinkedIn

A sailaway ceremony has been held to mark the departure of a floating production storage and offloading (FPSO) unit from Seatrium’s yard in Singapore to a field offshore Brazil operated by the country’s state-owned energy major Petrobras.

Based on a social media post by Petrobras’ Chief Operating Officer (CEO) Magda Chambriard , the unit set sail for the Búzios field on June 30, 2025. With a capacity of 225,000 barrels of oil per day (bopd), the FPSO P-78 will already be staffed, which the CEO says saves a month of pre-operation.

While disclosing that directors Renata Baruzzi and Sylvia dos Anjos took part in the ceremony, along with Petrobras’ engineering team, Chambriard also stated that the topsides for the unit were made in Brazil.

In February, the Brazilian giant brought online the sixth FPSO at Búzios, called Almirante Tamandaré . The remaining units working in the field are P-74, P-75, P-76, P-77, and Almirante Barroso.

Once the P-78 arrives at the field and becomes the field’s seventh unit , another four are set to join it for a total of 11 platforms under the current development concept.

Located in the Santos Basin, some 180 kilometers offshore from Rio de Janeiro, the Búzios field was discovered in 2010 and began operating in 2018. Petrobras is the operator (88.98% interest) on behalf of the Búzios Shared Reservoir Consortium, comprising CNOOC (7.34%) and CNPC (3.67%), with Pré-Sal Petróleo S.A. (PPSA) as the manager.

Búzios is the second field in terms of production volume and reserves in Brazil, behind the Tupi field. The field reached a record of 800 thousand barrels of oil produced daily in February.

Related Articles

Fossil Energy

Brazil’s field hits record oil production after welcoming sixth FPSO

2 min read

Earlier this month, the Brazilian firm announced that the topside construction had started for another FPSO, P-84. The 225,000-boepd unit will be installed in the Atapu field.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free