Sweden’s Port of Helsingborg is planning to build and inaugurate its first onshore power supply (OPS) facility for container vessels, in line with the long-term strategy of shutting the door to fossil-based operations.
According to the port’s officials, commissioning is envisioned for the fall of 2026, following which boxships will have the possibility to plug into electric power at berth at the container terminal.
