Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Nexans starts cable production for second Malta-Italy interconnector (Video)
Cabling

August 11, 2025 · about 1 year ago

Nexans starts cable production for second Malta-Italy interconnector (Video)

Nexans has produced and shipped approximately half of the total fiber optic cable length from Norway to the U.S. to be integrated into the high-voltage subsea cable destined for the second Malta-Sicily interconnector. The IC2 interconnector will consist of a new ~122-kilometer-long 225 MW HVAC elect

2 minutes read
  • LinkedIn
  • X
  • Email
Nexans to deliver second Malta-Italy interconnector, ten years after the first one
Nexans

Nexans has produced and shipped approximately half of the total fiber optic cable length from Norway to the U.S. to be integrated into the high-voltage subsea cable destined for the second Malta-Sicily interconnector.

The IC2 interconnector will consist of a new ~122-kilometer-long 225 MW HVAC electrical cable interconnection between the Terna substation at Ragusa, Sicily, and the Enemalta terminal station in Maghtab, to be laid in parallel to the existing HVAC cable link , also delivered by Nexans in 2015.

The overall interconnector cable link will be composed of a land cable in Sicily, approximately 21 kilometers long, a three-core submarine cable approximately 99 kilometers long, and a 2-kilometer land cable in Malta.

Under the contract formally signed in April in Malta, Nexans is in charge of the fiber optic production at its Rognan facility in Norway and high-voltage subsea cable manufacturing at its Charleston plant in South Carolina, the U.S.

Approximately half of the 104-kilometer total fiber optic cable length has been produced, tested, and shipped to the factory in Charleston.

To remind, IC2 obtained its final approval in January after securing the permit from the Italian Ministry for the Environment and Energy Security (MASE).

This second Malta-Sicily cable link is part of the Maltese Government’s future energy strategy for meeting the 2030 climate and energy targets and the longer-term decarbonization objectives.

The project, co-financed by the European Union under the European Regional Development Fund 2021-2027, is expected to be commissioned in 2026. The ERDF funding amounts to €165 million and will cover more than half of the total investment costs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingInterconnectorsSubseaBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free