Wave energy developer Eco Wave Power has completed operational testing and lowered its floaters into the water for the first time at its U.S. pilot station at the Port of Los Angeles. The milestone marks the company’s entry into the operational phase of its U.S. activities.
According to Eco Wave Power, the step follows completion of installation works, which included mounting all floaters, connecting hydraulic pipes and supporting infrastructure, and placing the onshore energy conversion unit. A formal unveiling ceremony is scheduled for September 9, 2025 , at AltaSea at the Port of Los Angeles.
