Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Construction of Canada’s $5.1 billion LNG project passes the halfway mark
Business & Finance

September 4, 2025 · about 11 months ago

Construction of Canada’s $5.1 billion LNG project passes the halfway mark

Woodfibre Management, a privately held Canadian company based in Vancouver, has reached a new construction milestone for its operated $5.1 billion liquefied natural gas (LNG) export project, under development in British Columbia, Canada.

2 minutes read
  • LinkedIn
  • X
  • Email
Modules arrive at the site in Squamish; Source: Woodfibre LNG

Woodfibre Management, a privately held Canadian company based in Vancouver, has reached a new construction milestone for its operated $5.1 billion liquefied natural gas (LNG) export project, under development in British Columbia, Canada.

Following the arrival of the first seven LNG modules at the Woodfibre LNG site in Squamish, construction activities are ongoing , with plans in motion to add a second workplace accommodation unit adjacent to the existing floatel, bringing around 900 skilled trades jobs.

The latest project update indicates that the Woodfibre LNG facility is halfway done, with four new specialized LNG modules at its project site near Squamish. These modules, which were transported overseas by a heavy lift vessel, entail two pipe rack sections, a boil-off gas compressor module, and a flare knock-out drums module.

Luke Schauerte , CEO of Woodfibre LNG, commented: “The arrival of new modules is another sign of the momentum we are carrying into the second half of construction. As modules continue to arrive, we are driving towards the delivery of the world’s first net-zero LNG export facility, built to the highest standards of safety and environmental sustainability.”

This content is available after accepting the cookies.

While explaining that the boil-off gas compressor helps capture natural gas that revapourizes (boils off) and re-injection back into the process to be reliquefied into LNG, the Canadian player underlines that flare knock-out drums are designed to protect the facility’s flare system by separating any liquids from gases set to be flared, ensuring safe and efficient flare operation.

With further module deliveries planned in the months ahead and into 2026, Woodfibre LNG’s construction phase is set to continue through 2025. The project is designed to be the world’s first net-zero LNG export facility, benefitting from the province’s hydroelectric capacity by using electric drives for LNG production.

This is anticipated to avoid over 230,000 tonnes of carbon dioxide equivalent versus conventional LNG facilities. The LNG project, which will produce 2.1 million tonnes of LNG for export annually, is owned by Woodfibre LNG Limited Partnership, owned 70% by Pacific Energy Corporation and 30% by Enbridge.

Deemed as the first industrial project in Canada to recognize a non-treaty Indigenous government, Squamish Nation, as a full environmental regulator, the Woodfibre LNG facility is envisioned to be the world’s first net-zero LNG facility upon completion in 2027.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago