Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Repairs ongoing as North Sea FPSO’s production levels drop
Business & Finance

September 10, 2025 · about 10 months ago

Repairs ongoing as North Sea FPSO’s production levels drop

Serica Energy has revealed a downturn in production volumes from a floating production, storage, and offloading (FPSO) vessel, which is deployed at its North Sea asset on the UK Continental Shelf (UKCS). Things are expected to improve by month-end once the unit’s repairs are out of the way.

2 minutes read
  • LinkedIn
  • X
  • Email
Dana-operated FPSO Triton lies approximately 6 km to the northeast in the UK Central North Sea; Source: Tailwind Energy

UK-based upstream oil and gas player Serica Energy has revealed a downturn in production volumes from a floating production, storage, and offloading (FPSO) vessel, which is deployed at its North Sea asset on the UK Continental Shelf (UKCS). Things are expected to improve by month-end once the unit’s repairs are out of the way.

After a restart of the FPSO Triton in July 2025, Serica confirmed the first oil lifting last month, as production kept increasing in line with the previously stated plan, with the resumption of production from certain wells on the Bittern field followed by wells on the Evelyn , Gannet E , and Guillemot West fields being brought online.

The ramp-up helped wider portfolio production reach over 55,000 boepd in mid-August. However, Dana Petroleum, as the operator of the FPSO, which has since notified Serica of a temporary reduction in production while further maintenance takes place, has also stated that subsea intervention work on the Bittern field has been scheduled for November 2025.

Thanks to the resultant production deferrals, Serica’s production guidance for 2025 has been reduced to 29,000 to 32,000 boepd from the previous 33,000 to 35,000 boepd. The UK firm claims that work is currently underway to deliver two compressor operations, which will facilitate the full ramp up of production at the FPSO.

As production is currently running at a significantly reduced rate due to a vibration issue within the compression trains on the FPSO Triton, normal production operations are expected to resume around the end of September, upon the completion of the required repairs.

While production net to Serica from this FPSO reached over 25,000 boepd in August, running with two compressors can deliver an increase from this figure through the addition of production from the EV-02 well on the Evelyn field, while the work on the Bittern field subsea infrastructure, which is scheduled to take three weeks to complete, is expected to address an emerging vulnerability.

This work scope, which had previously been removed from the outage in summer 2025 and was expected to be completed in 2026, will take place in November this year. Given the location of the pipework, in addition to the Bittern field, this will also halt production from the Evelyn and Gannet fields, resulting in a temporary reduction of over 20,000 boepd net to Serica.

Located in Block 21/30, approximately 120 miles (193.12 kilometers) east of Aberdeen, the FPSO Triton produces oil and gas from the Bittern , Clapham , Pict , Saxon , and Guillemot area , with fields tied back to the vessel via subsea facilities comprising a series of pipelines and manifolds.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago