Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Vard starts building industry’s ‘first’ energy construction vessel
Vessels

October 8, 2025 · about 9 months ago

Vard starts building industry’s ‘first’ energy construction vessel

Vard has cut the first steel for Norwind Offshore’s energy construction vessel (ECV), the first vessel of this category, according to the two companies. A steel-cutting ceremony was held on October 6 at Vard Vung Tau shipyard in Vietnam, kicking off the construction of the vessel, which Norwind Offs

1 minutes read
  • LinkedIn
  • X
  • Email
Vard starts building industry’s ‘first’ energy construction vessel

Vard says the ECV is designed to play a pivotal role in the construction and maintenance of offshore wind farms.

According to Vard and Norwind Offshore, this is a whole new vessel category, developed jointly by the two companies. The vessel is of VARD 3 11 design, which the company says is tailor-made for the offshore wind and subsea market, including inspection, maintenance and repair of pipes, and construction and installation of infrastructure above and below sea level.

This is the first construction vessel Vard will build with a permanently installed motion-compensated gangway for walk-to-work operations. A walk-to-work electrically controlled motion compensated (ECMC) gangway with integrated 3D compensated crane functionality will be installed. To expand capacities, especially towards the growing renewables market, a movement-compensated offshore crane of 150 tonnes is also being installed, according to the vessel designer.

The first ECV will be built, outfitted, commissioned and delivered from Vard Vung Tau shipyard, with the delivery scheduled for the second quarter of 2027.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

12 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

12 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago