Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Nexans sets world record by installing power cable 2,150 meters under water
Cabling

December 30, 2025 · about 8 months ago

Nexans sets world record by installing power cable 2,150 meters under water

France-headquartered cable systems designer and manufacturer Nexans has set a new world record in the subsea cable industry by installing a 500 kV HVDC power cable at a depth of 2,150 meters. Nexans reported it had achieved this milestone on the Tyrrhenian Link, described as one of Italy’s most sign

1 minutes read
  • LinkedIn
  • X
  • Email
Nexans sets world record by installing power cable 2,150 meters under water

France-headquartered cable systems designer and manufacturer Nexans has set a new world record in the subsea cable industry by installing a 500 kV HVDC power cable at a depth of 2,150 meters.

Nexans reported it had achieved this milestone on the Tyrrhenian Link , described as one of Italy’s most significant electrical infrastructures.

The 970-kilometer, 1,000 MW interconnector encompasses two sections: the west part, connecting Sicily and Sardinia, as well as the east one from Sicily to Campania.

Nexans started laying high-voltage subsea cable between Sicily and Sardinia in September as part of the western section of the project, which will stretch for 480 kilometers between the Fiumetorto landing point, Palermo, and the Terra Mala landing point, Cagliari.

The company’s cable-laying is divided into two phases, with the first, 200 kilometers long, completed in September, and the second, around 280 kilometers long, kicked off in December.

“The milestone was achieved on the Tyrrhenian Link project in Italy, in close collaboration with our customer, Terna SpA. It reflects years of engineering development, the performance of Nexans Aurora, and the precision and commitment of teams working across the entire value chain,” Nexans reported.

“A sincere thank you to Terna for the trust, and to all Nexans teams, including those who continued working through the holiday period, for making this world record possible.”

Tyrrhenian Link is scheduled to be fully operational in 2028.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingInterconnectorsSubseaBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free