Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Ocean Infinity set for geophysical survey at UK’s subsea electricity superhighway
Cabling

January 6, 2026 · about 8 months ago

Ocean Infinity set for geophysical survey at UK’s subsea electricity superhighway

Marine robotics company Ocean Infinity is expected to begin a geophysical survey for Eastern Green Link (EGL5), the UK’s fifth subsea electricity superhighway that would connect Scotland and England, in about one week. The marine survey activities are planned to commence on January 12 and to be comp

1 minutes read
  • LinkedIn
  • X
  • Email
Ocean Infinity set for geophysical survey at UK’s subsea electricity superhighway
Source: Notice to Mariners (KIS-ORCA)

Marine robotics company Ocean Infinity is expected to begin a geophysical survey for Eastern Green Link (EGL5), the UK’s fifth subsea electricity superhighway that would connect Scotland and England, in about one week.

The marine survey activities are planned to commence on January 12 and to be completed by the end of February.

Ocean Infinity will deploy its A7804 offshore survey vessel for the work, as well as the MV Elysse.

A geotechnical survey was on schedule to start in November 2025.

SSEN Transmission and National Grid Electricity Transmission (NGET) are working together to address the need for increased capacity within the transmission network between Scotland and England.

The EGL links form part of planned electricity grid reinforcements to boost the capability of the existing UK transmission network and facilitate increased flows of planned renewable generation in the North to demand centers to the South, supporting the ambition of enabling 50 GW of offshore wind generation by 2030 and achieving a net-zero economy by 2050.

EGL5 will consist of a high-voltage direct current (HVDC) cable connection between Aberdeenshire and Lincolnshire. The project, part of The Great Grid Upgrade , would transport enough clean energy from Scotland to power up to two million homes in parts of the Midlands and South of England.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingInterconnectorsSubseaSurveys & InterventionsVessels & VehiclesAuthorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersRegulation & PolicyTransitionVesselsVision

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free