The European Commission has approved a €9.56 million grant for the preparation of further studies for a 3 GW electrical interconnection that will link Greece’s and Egypt’s power systems.
Being developed by Elica Interconnector S.M.S.A, a member of the Copelouzos Group, the GREGY Project will transfer 100% clean energy produced from Egypt’s renewable energy sources to Greece, for the production of green H2 in the country, which will then be further transported to European countries.
