Under the agreement, the consortium was awarded contracts covering the design, manufacturing, transport, installation, protection and testing of 525 kV HVDC cable systems for the BalWin4, LanWin1, and LanWin5 grid connections in 2023, and received a letter of allocation (LOA) from TenneT for the supply of high-voltage direct current (HVDC) cables for the BalWin5 grid connection project in 2024.

Reach the Offshore Energy industry in one go!
Offshore Energy is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Follow Offshore Energy on:
