Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Statnett chooses DOF for replacement of ageing subsea power cables
Cabling

March 25, 2026 · about 5 months ago

Statnett chooses DOF for replacement of ageing subsea power cables

Norway’s transmission system operator (TSO) Statnett has awarded DOF Group with a contract defined as substantial, meaning it is worth between $25 million and $50 million, for the replacement of high-voltage subsea power cables. The scope covers partial removal of ageing subsea power cables across O

1 minutes read
  • LinkedIn
  • X
  • Email
Statnett chooses DOF for replacement of ageing subsea power cables
Illustration only. Source: DOF

Norway’s transmission system operator (TSO) Statnett has awarded DOF Group with a contract defined as substantial, meaning it is worth between $25 million and $50 million, for the replacement of high-voltage subsea power cables.

The scope covers partial removal of ageing subsea power cables across Ofotfjorden in the north of Norway, between Lødingen and Barøya, and the installation of four new 170 kV submarine cables bundled with fiber optic lines.

According to DOF , the campaign includes bundled cable laying in water depths ranging from 10 to 450 meters.

Preparatory works, including project management, engineering and procurement, start immediately from DOF’s Norwegian and Scottish offices, with main execution planned between May and September 2027 for approximately 40 days, performed by DOF’s high-capacity construction vessel.

Preparatory survey, logistics and onshore works will be carried out throughout 2026 and 2027.

“We are proud that Statnett has placed its confidence in DOF for this critical infrastructure project. The Ofotfjorden cable replacement is a comprehensive scope that plays directly to our strengths: engineering capability, subsea execution, and seamless integration of vessels, equipment, and our specialist teams,” said Mons S. Aase , DOF Group CEO.

“This award reinforces our track record within power cable installation and demonstrates the market’s trust in DOF as a reliable partner for complex subsea operations. We look forward to working closely with Statnett to deliver a safe, efficient, and high-quality project for Norway’s electricity network.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free