Ramboll is participating in an urban development project “City to Harbour” launched in the Danish offshore capital, Esbjerg. The project is part of a large, urban renewal plan for Esbjerg, and involves ten distinct projects, which will tie city and harbor closer together over the next ten years, and
Rotterdam World Gateway (RWG) has started construction of the first phase of its deep-sea container terminal on Maasvlakte 2. The 108 hectare site with a quay wall of 1,150 meters (depth of 20 meters), and a 550-metre quay specifically designed for barges has already been built by the Port of Rotter
Subsea Vision has taken delivery of a Saab Seaeye Cougar XT Compact, the low profile powerful ROV specially designed for working in high current areas and where access is restricted. Subsea Vision’s immediate target market for the Cougar XT Compact is the North Sea oil and gas industry. Further appl
Subsea Vision has taken delivery of a Saab Seaeye Cougar XT Compact, the low profile powerful ROV specially designed for working in high current areas and where access is restricted. Subsea Vision’s immediate target market for the Cougar XT Compact is the North Sea oil and gas industry. Further appl
Oil and gas industry solutions provider AGR has signed a Master Well Services Contract and a Service Order with Chevron U.S.A. Inc. (Chevron). Under these agreements, AGR will provide Dual Gradient Drilling (DGD) offshore operational services for Chevron’s deepwater Gulf of Mexico programme for up t
Development is underway to design the modern world’s first 100 per cent fossil fuel free sailing cargo ships. With rising fossil fuel prices and the global challenge of reducing greenhouse gas emissions, this project is set to change the shipping industry by providing efficient and affordable low-ca
Vantage Drilling Company announced yesterday that it has received two contract awards for the Sapphire Driller adding an additional well to the Sapphire Driller’s current drilling program and three wells from another customer in the Ivory Coast. The contracts will commence in continuity with the cur
NewLead Holdings Ltd. yesterday announced that the Company entered into an agreement with Piraeus Bank S.A. to proceed with the sale of the two tanker vessels, Hiona and Hiotissa, for an aggregate amount of $57.0 million and to convert, subject to satisfaction of certain conditions precedent by the
Nido Petroleum Philippines Pty Ltd, a subsidiary of Nido Petroleum Limited, as Operator of Service Contract 54, on behalf of the SC 54A and SC 54B Joint Venture Partners, wishes to advise that the Philippines Department of Energy (‘DOE’) have agreed to extend Sub-phase 6 for a period of twelve (12)
Nexus Energy Limited (Nexus) advises that the vessel to inspect and potentially rectify the electrical fault that caused the suspension of Longtom offshore gas field production announced on 6 June 2012 arrived on site on 20 June 2012. Initial inspections have successfully identified the fault to be
An LNG Tanker LNG Aries has been attacked by pirates on Wednesday off the coast of Oman, Reuters informs citing International Maritime Bureau. Namely, a small dhow manned by 5-6 persons crew, armed with guns and rocket propelled grenades approached the tanker and opened fire. Three shots appear to h
Survey company Geo Plus will soon be putting into service its brand new survey ship Geo Focus. This innovative, hybrid ship will be officially christened on 23 June. The 35 metre long Geo Focus, which Geo Plus commissioned, was developed through a collaboration between Studio Yacht and De Haas Maass
Survey company Geo Plus will soon be putting into service its brand new survey ship Geo Focus. This innovative, hybrid ship will be officially christened on 23 June. The 35 metre long Geo Focus, which Geo Plus commissioned, was developed through a collaboration between Studio Yacht and De Haas Maass
Nido Petroleum Limited, as Operator of Service Contract 54 offshore Phillipines, announces that the Philippines Department of Energy (‘DOE’) have agreed to extend Sub-phase 6 for a period of twelve (12) months from 4 August 2012 to 4 August 2013. The twelve (12) month extension to Sub-Phase 6 will e