Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceTechnologyOperations & MaintenanceResearch & DevelopmentProject & Tenders
Damen to supply propeller nozzles for 4 ocean going tugs
Equipment

Damen to supply propeller nozzles for 4 ocean going tugs

Damen Marine Components will supply a total eight 5,050 millimetre propeller nozzles for four ultra long distance towing and anchor handling vessel newbuildings. They are the largest nozzles that DMC will have manufactured with its spinning machine technique to date. The order was granted by Caterpi

about 12 years ago
Dolphin hired for 16-streamer seismic survey in Kara Sea
Equipment

Dolphin hired for 16-streamer seismic survey in Kara Sea

Dolphin Group ASA has been awarded an industry first ever 16-streamer 3D seismic contract for an undisclosed client in the Kara Sea, offshore Russia.

about 12 years ago
Judge’s Decision Means More Money for Gulf Coast Restoration
Equipment

Judge’s Decision Means More Money for Gulf Coast Restoration

United States District Court Judge Carl Barbier yesterday ruled that BP was “grossly negligent” in its actions leading to the 2010 Deepwater Horizon oil spill in the Gulf of Mexico. This ruling means that BP faces penalties of up to $4,300 per barrel of oil spilled, maximizing the money that will be

about 12 years ago
Mubadala Starts Manora Drilling
Equipment

Mubadala Starts Manora Drilling

Mubadala Petroleum, Operator of the Manora Oil Development joint venture, has advised that the Atwood Orca jackup drilling unit spudded the first of 15 planned development wells, MNA-02. The MNA-01 and MNA-02 wells will be batch drilled to final total depths of 2,104 m and 2,441 m measured depth res

about 12 years ago
Picture of the Day: Lake Neatahwanta Dredging
Equipment

Picture of the Day: Lake Neatahwanta Dredging

State Senator Patty Ritchie has recently secured $200,000 in special funding to help the City of Fulton and the Town of Granby in their work to dredge Lake Neatahwanta and ultimately make the body of water usable again. For more than 25 years, the beaches surrounding Lake Neatahwanta have been close

about 12 years ago
Oceanographers Work on Predicting Toxic Algal Blooms Off Washington
Equipment

Oceanographers Work on Predicting Toxic Algal Blooms Off Washington

Late summer is the peak time for harmful algae that can turn lakes into toxic scum, canceling fishing trips and fouling water supplies. While the Pacific Northwest doesn’t get anything near the activity that turned parts of Lake Erie into bright green slime, Washington and Oregon coasts are vulnerab

about 12 years ago
Civmec Nets Subsea Contracts for Prelude and Wheatstone LNG Projects
Equipment

Civmec Nets Subsea Contracts for Prelude and Wheatstone LNG Projects

Civmec Limited secured contracts in the Liquefied Natural Gas (LNG) sector with the awards of projects for the Shell Prelude Floating LNG project and the Wheatstone LNG project. Civmec has been awarded a master service order contract by Technip in Australia for the supply, fabrication and testing of

about 12 years ago
ShawCor completes interest sale of Socotherm Brasil
Equipment

ShawCor completes interest sale of Socotherm Brasil

ShawCor Ltd has announced that it had completed the sale of its Socotherm division’s joint venture interest in Socotherm Brasil to its joint venture partner, Tenaris. ShawCor first announced the sale in December 2013. Socotherm Brasil operates a pipe coating facility which is managed by Tenaris and

about 12 years ago
More Investment Needed, Says APM Terminals
Equipment

More Investment Needed, Says APM Terminals

Speaking at the Trade Americas & ConnectAmericas Expo: Building the Americas conference in Miami, APM Terminals Vice President and Chief Financial Officer Christian Moller Laursen observed that economic and population growth rate projections for Latin America have not yet been matched by the port an

about 12 years ago
USA Invests in Marine and Hydrokinetic Development
Equipment

USA Invests in Marine and Hydrokinetic Development

The Energy Department has announced $7.25 million funding for six organizations that will continue to advance water power as a viable resource for America’s clean energy portfolio. Marine and hydrokinetic (MHK) technologies convert the energy of waves, tides, rivers, and ocean currents into electric

about 12 years ago
VIDEO: Launching of Senwatec Аmphi-King Dredger
Equipment

VIDEO: Launching of Senwatec Аmphi-King Dredger

Аmphi-King from the German manufacturer Senwatec is a first ever made amphibious boat of this type and PROGROUPE is the first company to use such equipment. Amphi-King is a brilliant solution for reconstruction of water bodies with limited spatial possibilities (ponds at golf course or in the park o

about 12 years ago
Trelleborg Develops New Subsea Vibration Suppression System
Equipment

Trelleborg Develops New Subsea Vibration Suppression System

Trelleborg’s offshore operation has launched an innovative new vortex induced vibration (VIV) system. The high performance T-Strake™ features a unique modular design enabling more efficient transportation and installation. Jonathan Fox, senior product development engineer for Trelleborg’s offshore o

about 12 years ago
Corps Partners with Clemson to Monitor Marshes for Harbor Dredging
Equipment

Corps Partners with Clemson to Monitor Marshes for Harbor Dredging

Thanks to a partnership with Clemson University and the U.S. Army Corps of Engineers, scientists are collecting valuable data in the Savannah River estuary for the Savannah Harbor Expansion Project (SHEP). The research is part of an extensive pre-construction monitoring plan to establish a baseline

about 12 years ago
UPDATE: Dredging at Port of Wells Set for Next Week
Equipment

UPDATE: Dredging at Port of Wells Set for Next Week

The Port of Wells dredging program is scheduled for Monday, September 8, 2014. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 2 and 4. All material dredged from these areas will be placed on the berm which is marked by

about 12 years ago
  • 1
  • …
  • 1111
  • 1112
  • 1113
  • …
  • 1895