Stephanie Wilson, Senior Project Scientist with ESS Group, Inc., chaired the EBC 8th Annual Ocean Resource Management Conference: Update on Dredging In New England – Disposal and Beneficial Reuse held on Thursday, June 26, 2014 in Boston, MA. Under Wilson’s leadership, this program brought together
Saipem has been awarded contracts for the extension of leasing and upgrading works of the Cidade de Vitoria FPSO (Floating Production Storage and Offloading vessel) in Brazil. The company has also been awarded a lease extension and operation contract for the Gimboa FPSO in Angola. These contracts ar
Work to improve boat navigation near Crescent Bar is expected to begin next month, according to an agreement reached between Grant PUD and Crescent Bar Inc. Under the agreement, Grant PUD will remove about 45,000 cubic yards of sediment in the channel that connects the Crescent Bar Boat Launch with
Atlantic Petroleum has announced that the initial production testing from the Blackbird Field second production well, 20/02a-B3, has achieved sustained rates of over 7,000 bbls/day (c. 660 bbls/day net to Atlantic Petroleum), which was constrained by surface equipment. The well is being drilled and
Ports North is continuing its consultation with the region’s stakeholders and will be consulting with the community ahead of submitting its Environmental Impact Statement (EIS) for the Cairns Shipping Development Project later this year. Ports North Chairman Brett Moller said community input into th
The Korean based global shipping company Pan Ocean, has ordered OCTOPUS-Onboard system from Amarcon for two semi-submersible heavy lift vessels. The state-of-the-art ship monitoring and advisory system will support the vessels’ route planning, optimization of speed, heading and fuel consumption. For
KAMPS, a Belgium-based company specialised in water treatment projects, has introduced the Drag’oon, an efficient solution for the dredging projects. The system’s two flow pumps (upside/downside), mounted on a very maneuverable barge, provide good dredging power. The Drag’oon is completely remote co
The Board of Directors of Ezion Holdings Limited has announced that it has secured a contract with an approximate value of USD 122.6 million to provide a Service Rig over a 7 year period to support the oil & gas activities of an east European based national oil major in the North Sea. The Service Ri
The Charleston District’s survey section is no stranger to using advanced visualization technologies to support the District’s decision makers. Recently, while hosting a seafloor mapping S.T.E.M. outreach event with the College of Charleston’s Marine Geology Mapping Group, the survey team was introd
The Essayons, a Corps-owned and operated hopper dredger, recently removed 1.6 million cubic yards of shoal material from the Cook Inlet Navigation Channel. The project was completed with the help of the Westport, a suction dredger owned and operated by Manson Construction. Dredging is a necessary ma
The Charleston District’s survey section is no stranger to using advanced visualization technologies to support the District’s decision makers. Recently, while hosting a seafloor mapping S.T.E.M. outreach event with the College of Charleston’s Marine Geology Mapping Group, the survey team was introd
International software firm 8over8 Ltd. has announced the launch of ProCon™ 2014, the latest release of its flagship contractual risk management solution. ProCon 2014 enables owner operators of large capital projects to establish a commercial firewall against value leakage from mismanagement of unfo
The U.S. Army Corps of Engineers, Detroit District, will co-host a public information session on a proposed ecosystem restoration project on the Boardman River. USACE has completed the feasibility study on the proposed project and in cooperation with Grand Traverse County, the City of Traverse City,
A plan to implement enhanced flood risk reduction features around West Sacramento’s perimeter was revealed yesterday as the U.S. Army Corps of Engineers Sacramento District released its draft general re-evaluation report and draft environmental impact statement for the West Sacramento project for pu