Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceResearch & DevelopmentExploration & ProductionTechnologyVesselsOperations & Maintenance
Sonardyne’s Life of Field Workshops, Platform for Subsea Techniques Discussions
Equipment

Sonardyne’s Life of Field Workshops, Platform for Subsea Techniques Discussions

Sonardyne International Ltd.’s latest round of subsea technology workshops were attended by over 100 offshore industry professionals including oil company representatives, hydrographic surveyors, subsea engineers and asset managers. Held over three days at the AECC conference centre in Aberdeen, the

about 12 years ago
Orga Offshore installs Circle-H helideck lights on Ensco rigs
Equipment

Orga Offshore installs Circle-H helideck lights on Ensco rigs

Orga Offshore has installed its innovative CAP 437-compliant Circle – H LED touchdown, positioning and heliport dentification marking system on Ensco’s jackup drilling rigs ENSCO 70 and ENSCO 80. The latter marks the fifth installation for Orga in as many weeks and with orders to deliver and insta

about 12 years ago
VIDEO: Congressman Discusses Port of Brownsville Dredging (USA)
Equipment

VIDEO: Congressman Discusses Port of Brownsville Dredging (USA)

U.S. Congressman Blake Farenthold (TX-27) recently joined a House Transportation and Infrastructure Subcommittee on Water Resources & Environment hearing titled “A Review of Recent United States Army Corps of Engineers Chief’s Reports and Post Authorization Change Reports”. This hearing aimed to pro

about 12 years ago
USA: Jacksonville District Gets New Survey Boat
Equipment

USA: Jacksonville District Gets New Survey Boat

The modernization of USACE Jacksonville District’s fleet of survey boats continues with the arrival of its newest vessel. Crew members took delivery of the new boat, known as SB-48, in the past few weeks and have been working to install survey equipment so it will be ready to perform missions later

about 12 years ago
Minister: Protection of GBR is Top Priority for Australian Government
Equipment

Minister: Protection of GBR is Top Priority for Australian Government

The Abbott Government is protecting the Great Barrier Reef by delivering the election commitment to implement a Reef 2050 Plan, said Environment Minister Greg Hunt. The Reef 2050 Plan includes a Long Term Sustainability Plan and the establishment of a new $40 million Reef Trust to deliver important

about 12 years ago
UK: Somerset Flood Relief Plans Make Progress
Equipment

UK: Somerset Flood Relief Plans Make Progress

Plans to help prevent significant flooding in parts of Somerset and improve the county’s roads moved a step closer this week after a key decision. Proposals totalling more than £20m were rubber-stamped yesterday by Councillor Harvey Siggs, Somerset County Council’s Cabinet member for Highways. Counc

about 12 years ago
Boskalis: Revenue Level Higher Compared to Same Period Last Year
Equipment

Boskalis: Revenue Level Higher Compared to Same Period Last Year

Boskalis, a leading global maritime services company operating in the dredging and inland infra, and offshore energy sectors, realized a higher revenue in the first quarter of 2014 compared to the same period in 2013. Adjusted for the acquisition of Dockwise, which was only included in the consolida

about 12 years ago
Dr. Cornwell Receives UMCES President’s Award (USA)
Equipment

Dr. Cornwell Receives UMCES President’s Award (USA)

Dr. Jeffrey Cornwell, a professor at the Horn Point Laboratory and an expert in sediments, water quality, and wetlands, has been honored by the University of Maryland Center for Environmental Science with the President’s Award for Excellence in Application of Science. Dr. Cornwell was recognized for

about 12 years ago
HR Wallingford: Course on Flood and Coastal Assets Approaches
Equipment

HR Wallingford: Course on Flood and Coastal Assets Approaches

HR Wallingford has announced that its conference named “Management of above-ground flood and coastal assets” will take place on 15 May 2014, in Wallingford, UK. This event will provide an understanding of the asset management life-cycle. It will also cover the methods and tools that are available ac

about 12 years ago
USA: Dredging Program at Longboat Key About to Start
Equipment

USA: Dredging Program at Longboat Key About to Start

The Longboat Key dredging project is expected to begin tomorrow, and it will last until the middle of July. Dredging operations will typically run six days a week, 12-hours, excluding Saturdays, but may extend to seven days, 24-hour operations. Heavy equipment will be moving around the beach support

about 12 years ago
Petrobras: Platform P-62 Starts Production in Roncador Field
Equipment

Petrobras: Platform P-62 Starts Production in Roncador Field

Petrobras started-up production on platform P-62 in the Campos Basin’s Roncador field. This is one of the strategic projects in the 2014-2018 Business and Management Plan. Deployed at a water depth of 1,600 meters, P-62 is an integral part of the Module 4 project for the Roncador field. Twenty-two w

about 12 years ago
Nautricity Deploys CoRMaT Tidal Turbine at Shapinsay Sound
Equipment

Nautricity Deploys CoRMaT Tidal Turbine at Shapinsay Sound

Nautricity has successfully deployed their CoRMaT tidal turbine at EMEC’s Shapinsay Sound site. The 10m diameter contra-rotating turbine was installed at the site for the first time last week. The company also re-installed their HydroBuoy mooring system which was previously tested, analysed and opti

about 12 years ago
Fiji: Oinafa Jetty Dredging to Bring More Business
Equipment

Fiji: Oinafa Jetty Dredging to Bring More Business

The dredging work at Oinafa Jetty is aimed at improving shipping services to the Island of Rotuma. A study of the area late last year revealed that sand has accumulated in the harbour over time and that a limited number of vessels were able to access the jetty only at high tide. Ships would arrive,

about 12 years ago
UK: Chesil Cove Sea Wall Repairs Completed
Equipment

UK: Chesil Cove Sea Wall Repairs Completed

Work to repair the storm-battered sea wall at Chesil Cove on Portland has been completed by Weymouth & Portland Borough Council in partnership with the Environment Agency and contractor Team Van Oord Ltd. Heavy winds and strong tides hit the Dorset coast hard during the winter period, damaging secti

about 12 years ago
  • 1
  • …
  • 1275
  • 1276
  • 1277
  • …
  • 1895