Total E&P UK Limited has awarded Ocean Installer a contract for the recovery of casing at the Tomintoul location, west of the Shetland Islands. The scope of the work involves the cutting and recovery of 472 meters of 20” downhole casing from the seabed, at approximately 580m water depth. The onshore
Tata Steel will demonstrate its ability to deliver pipeline solutions to some of the world’s most challenging and complex projects at this year’s ONS Norway in Stavanger. With global energy demands ever-increasing the industry is turning its attention to deeper and more challenging environments. Tat
Tata Steel will demonstrate its ability to deliver pipeline solutions to some of the world’s most challenging and complex projects at this year’s ONS Norway in Stavanger. With global energy demands ever-increasing the industry is turning its attention to deeper and more challenging environments. Tat
Brazilian oceanographic consulting firm HidroMares has been using a Homer Pro underwater relocation system supplied by Sonardyne Brasil Ltd. as part of a currents and waves monitoring survey in Sepetiba Bay, Rio de Janeiro. Contracted by Odebrecht as part of a shipyard and naval base construction pr
Sulzer Pumps will supply 42 pumps for installation on two Floating Production Storage and Offloading (FPSO) vessels (P-66 and P-69) that will operate in the Pre Salt Iracema cluster areas located in the Santos Basin, off the coast of Rio de Janeiro, Brazil. The order, consisting of pump packages for
Sulzer Pumps will supply 42 pumps for installation on two Floating Production Storage and Offloading (FPSO) vessels (P-66 and P-69) that will operate in the Pre Salt Iracema cluster areas located in the Santos Basin, off the coast of Rio de Janeiro, Brazil. The order, consisting of pump packages for
Freudenberg Sealing Technologies Merkel (Freudenberg) had a goal: less noise pollution for harbor porpoises affected in the installation of offshore wind turbine systems. Through the development of a special sealing system, Freudenberg was able to reduce the underwater noise generated during foundat
Polarcus Limited refers to the stock exchange notification of 16 August 2013 regarding the law suit filed by WesternGeco L.L.C. against Polarcus. WesternGeco on 15 August 2013 filed a lawsuit against Polarcus US Inc and Polarcus Limited, in the United States federal court in Houston, Texas, alleging
Halliburton has officially opened the expansion of its Malaysia Manufacturing and Technology Centre in Senai, Malaysia, Saturday. The additional capability will allow the company to expand its delivery of high-quality products to meet the growing needs of customers in the Eastern Hemisphere and glob
Jan De Nul Group Orders New Multipurpose Vessel Last week, Jan De Nul Group ordered a new vessel at the Uljanik Shipyard in Pula, Croatia. The vessel with a deadweight of 10,500 tonnes and a total length of 138 m will be a multipurpose vessel. IHC Merwede Presents New Generation of Omnibarge (The
Det Norske Veritas Research & Innovation (DNV), a world leader in corrosion, materials, and structural integrity, has committed to fund a second major faculty position within the Department of Materials Science and Engineering (MSE) at The Ohio State University to advance corrosion research. A longs
Houlder and MPI Offshore prove bigger is better by installing 650t pile Gripper Arms. The pile Gripper Arms, installed this week, stabilise 6m diameter 650t steel piles as they are driven into the seabed by the MPI Discovery installation jack up vessel. Installed on the vessel’s stern below deck lev
An NOC underwater glider has completed a 58-day mission in the Irish Sea zigzagging a total of 1685 miles – while avoiding hazards such as fishing vessels and shipping lanes. The mission has provided over 10,000 profiles of the water column from the near surface to 100metres deep. Gliders are propel
Rijkswaterstaat Dienst Noordzee announces that it has awarded a provision and maintenance contract for a Remotely Operated Vehicle (ROV). The contract is for a period of five years and it includes a control cabin, launch and recovery system (LARS) and an Ultra-short baseline underwater positioning s