PGNiG was informed by its Norwegian subsidiary that the production start from the Skarv field on the Norwegian Continental Shelf is now likely to be deferred from the first quarter 2012 to the second quarter 2012. The reasons are harsh weather conditions on the Norwegian Sea during the installation
The Department of the Interior’s Bureau of Ocean Energy Management announced that its Western Gulf of Mexico Oil and Gas Lease Sale 218, held in New Orleans, attracted $337,688,341in high bids and included 20 companies submitting 241 bids on 191 tracts comprising over a million acres offshore Texas
The National Energy Board (NEB or the Board), an independent federal regulator of several parts of Canada’s energy industry released filing requirements for future applications to drill in the Canadian Arctic Offshore. The Filing Requirements follows several months of extensive consultation carried
Dragon Oil plc, an international oil and gas exploration, development and production company, announces the completion and initial testing of the Dzheitune (Lam) 28/164 development well, offshore Turkmenistan. The well was drilled to a depth of 1,865 metres and completed as a single producer by the
BOURBON opens a new affiliate in Saint Petersburg, Bourbon Baltic, which will provide clients with first-class ship management resources. It complements BOURBON’s current operations in Sakhalin. Global leader in offshore oil and gas marine services, BOURBON opens Bourbon Baltic, an affiliate based i
Fugro Brasil has signed a contract with Wilson Sons to build a DP-2 ROV Support Vessel in Brazil. The vessel´s total length is 83 meter with a main deck space of 520 square meter, gross tonnage of 4,400 ton, and accommodation for in total 60 persons. The vessel will be built at Wilson Sons´ shipyard
Newly founded offshore support company World Wide Support (WWS) has ordered four PSV 3300 CD’s with Damen Shipyards. The PSV 3300 CD, built according to Damen’s E3 principles, is a newly designed platform supply vessel for servicing oil and gas rigs worldwide and is specifically designed to perform
BP today announced that it has reached agreement with Cameron International Corporation (“Cameron”), the designer and manufacturer of the Deepwater Horizon blowout preventer, to settle all claims between the companies related to the Deepwater Horizon accident and spill. BP and Cameron have concluded
Kosmos Energy announced today that Darrell McKenna has been named as Chief Operating Officer. In this role, McKenna will be responsible for the Company’s global drilling, development, and production functions, as well as Kosmos’ health, environment, and safety programs, beginning January 3, 2012. Pr
EMGS and Schlumberger have announced the intention to enter into a cooperative agreement effective from 3 January 2012 in which the parties will offer to the industry their respective expertise in the marine electromagnetic related fields of processing, advanced modelling and earth model building. S
The Petroleum Safety Authority Norway (PSA) carried out an audit targeting drilling and well technology systems on board the West Elara jack-up drilling rig. North Atlantic Drilling has applied to the PSA for an AoC (Acknowledgement of Compliance) for West Elara. The facility has not previously had
An environmental impact assessment published in November 2011 is the latest study to declare EM surveying environmentally benign, reported EMGS, a Norwegian electromagnetic survey specialist on its website. The environmental impact assessment commissioned by the International Association of Geophysi
Anadarko Petroleum Corporation announced that it, along with its co-venturers, have sanctioned the development of the Lucius project, located in the Keathley Canyon area of the deepwater Gulf of Mexico. “We are very pleased to achieve this important milestone in the development of the deepwater Luci
Oil & Gas industry solutions provider AGR is celebrating a milestone achievement for its drilling technology. Its Riserless Mud Recovery system (RMR™) and Cutting Transportation System (CTS™) have now been deployed on more than 500 wells. This achievement is not only an indication of AGR’s experienc