Until November 2009, Bethany Beach looked pretty much like it does today — a wide expanse that drops off at the ocean. Then, two storms hit within days and waves and erosion cut away at a protective sand dune, leaving a 15-foot drop-off to the narrow beach that remains. Over the last several weeks,
FLIR Systems, Inc. announced today that it has teamed with Sonardyne International Ltd, UK on a substantial multi-million dollar project in the United Arab Emirates. The companies, with FLIR as the project leader, will provide a commercial-off-the shelf (COTS), integrated perimeter and coastal prote
The Swire Blue Ocean parent company, Swire Pacific Offshore Operations (Pte) Ltd., recently placed an order with Korea’s Samsung Heavy … (marinelog) [mappress] Source: marinelog, February 22, 2011
As part of the “Metropolitan Solutions” exhibition in Hall 8 at the Hanover Fair from April 4 to 8, Siemens Energy will present four … (webwire) [mappres] Source: webwire, February 22, 2011
Until now, the most appropriate solution for vibration measurements underwater or in situations of temporary submersion, has been to use the DeltaTron® Accelerometer, Type 5958-A. This is an excellent solution for use at temperatures up to 100oC With the introduction of high-temperature DeltaTron® (
President Barack Obama’s proposed budget for 2012, released last week, has raised some concerns for Port of Pascagoula leaders… By April M. Havens (gulflive) [mappress] Source: gulflive, February 22, 2011;
OAO Gazprom will decide on the amount of investment in the Shtokman gas field in March, Chief Executive Alexei Miller said Monday… (capital.gr) [mappress] Source: capital.gr, February 22, 2011;
DNV’s new report, Greener shipping in North America, proposes that LNG is the most efficicient and economical way to meet air emissions requirements in the US and Canada that take effect in August 2012. Environmental Control Areas (ECA) will gradually be enforced along the North American coastlines.
Subsea 7 S.A., a global leader in seabed-to-surface engineering, construction and services, announced the award of an engineering and installation contract by Chevron U.S.A. Inc. for Tahiti Phase 2 development in the Gulf of Mexico. The Subsea 7 workscope is to install one 7.5” x 13,000ft long flexi
An interactive forum and networking event for project owners, financiers, insurers, contractors, construction lawyers, regulators, government agencies and NGOs, advisors to decision makers in the maritime infrastructure construction industry. This two-day forum with the theme Partnering Creates Poss
U.K. natural gas grid operator National Grid PLC Monday said two liquefied natural gas ships berthed at its Isle of Grain regassification te… [mappress] Source: wsj, February 21, 2011;
Newly released images taken on an underwater security ‘trip’ barrier, show the superb quality of image resolution that can be achieved… (defpro) [mappress] Source: defpro ,February 21, 2011;
The government is planning to expand the coverage of the proposed $1.2 billion Batangas-Manila natural gas pipeline to include delivery of… (malaya) [mappress] Source: malaya, February 21, 2011;
Israeli navy is drawing up plans to secure facilities of several offshore gas drilling sites in the eastern Mediterranean and future explora… (istockanalyst) [mappress] Source: istockanalyst, February 21, 2011;