Anchor handling tug supply vessel Normand Master.
Bergungsschlepper “Ursus” im Hamburger Hafen am 11. 01. 2009 – mit 218 Tonnen Pfahlzug einer der Kraftprotze auf See – 2008 built Anchor Handling Tug “Ursus” (Hamburg inbound)
Bergungsschlepper “Ursus” im Hamburger Hafen am 11. 01. 2009 – mit 218 Tonnen Pfahlzug einer der Kraftprotze auf See – 2008 built Anchor Handling Tug “Ursus” (Hamburg inbound) with its bollard pull of 218 tons is one of the most powerfull tugs around
The MÆRSK LIFTER, an anchor handling tug supply vessel, moored in Grand Harbour, Malta
The jack up rig PV Drilling II at Vung Tau anchorage – April 29th, 2010
Rowan Gorilla 5, Jack-up installation (left) alongside Franklin
Global Santa Fe’s constellation jack up, working off east coast of Trinidad in September 2004. This is a Friede & Goldman JU-2000 class rig, capable of drilling to 30,000 ft in water depths up to 400 ft. It was one of two identical rigs built at the PPL Shipyard in Singapore and delivered in June [&
Dredging work on the main access channel to the port of Beira in Mozambique’s Sofala province, with the aim of allowing ships with a draught… (macauhub) [mappress] Source: macauhub, July 29, 2010;
A self-contained combination drilling rig and floating barge, fitted with long support legs that can be raised or lowered independently of each other. The jackup, as it is known informally, is towed onto location with its legs up and the barge section floating on the water. Upon arrival at the drill
The Cebu Port Authority (CPA) will submit to the Department of Transportation and Communication (DOTC) its documents on a P600-million … By Elias O. Baquero (sunstar) [mappress] Source: sunstar, July 29, 2010;
AWE Limited advises that the Tuatara-1 exploration well started drilling at 1000 hours (NZ time) on Wednesday July 28, 2010. At 0600 hours today the well was at a measured depth of 160 metres after running and cementing 30” conductor. Tuatara-1 is located in PEP 38524, in the western Tasman Bay in t
The Cohoes Common Council in a 5-1 vote, passed a resolution of support for the navigational dredging of the Champlain Canal… By Randy S. Koniowka (blog.timesunion) [mappress] Source: blog.timesunion, July 29, 2010;
keppel verolme shipyard
BP to pay an estimated $60 million in advance payments in August. BP said it estimates it will pay at least $60 million in advance payments in August to claimants across the Gulf Coast who have lost income or net profit due to the oil spill in the Gulf of Mexico. BP, which has paid […]