
Germany’s Federal Maritime and Hydrographic Agency (BSH) has pushed back the deadlines for the tender for geological modeling and reporting on wind areas in the North and Baltic Seas.

The U.S. Department of Energy (DOE) has called for applications for funding that will support offshore wind technology demonstration and wind resource characterisation projects.

Seiche Environmental has been appointed to monitor and manage the safety of marine mammals at the Triton Knoll offshore wind project site in the UK. Seiche Environmental stated it is in charge of implementing important mitigation measures at the site offshore Lincolnshire, despite it already being a

DHI has expanded its Metocean Data Portal with a new dataset to be used for offshore wind development in Japan, South Korea and elsewhere in the APAC region.

Siemens Gamesa has resumed production at its blade factory in Hull today (1 April), after pausing operations on 24 March.

The fabrication of foundations for Taiwan Power Company‘s Changhua Phase 1 offshore wind project has neared completion, Jan De Nul reported. The project will feature 21 5.2 MW turbines located off the coast of Fangyuan in Central Western Taiwan. The jackets are being manufactured at the South Korean

This winter, offshore wind energy covered some 9 percent of the total electricity demand in Belgium, which represents a 50 per cent increase over the annual average in 2019.

C-bed and MHI Vestas have commenced a multiple offshore wind farm upgrade campaign at four European projects. The project includes the upgrading of turbines at the Burbo Bank Extension and Walney Extension projects in the UK, Borkum Riffgrund 2 in Germany and Norther in Belgium. C-bed’s DP2 walk-to-

Deutsche Bank has closed a deal contingent interest rate swap on TW$ 90 billion (around € 2.7 billion) project finance for the development of the 589 MW Changfang and Xidao wind farm off Changhua County, Taiwan. The investment consortium, led by Copenhagen Infrastructure Partners (CIP) through its f

The second phase of offshore soil investigations at the Hudson North and Hudson South wind zones off new York has started, the Netherlands-based consultancy, BLIX, said. The second stage of the investigation started in February, the consultancy said. BLIX defined a program for the offshore soil inve

JDR Cable Systems has completed the delivery of subsea power cables and accessories to Jan De Nul for Taiwan Power Company’s Changhua Phase 1 offshore wind project. JDR designed and manufactured 65km of inter-array and export cable to transmit power from the wind turbines to the shore. The 33kV cabl

The Dutch government is opening the tender to develop the Hollandse Kust (noord) offshore wind farm on Thursday, 2 April. The tender will remain open until 30 April. The Dutch government has expressed confidence that, similarly to the Hollandse Kust (zuid) 1 and 2, and the Hollandse Kust (zuid) 3 an

The 252MW Deutsche Bucht offshore wind farm located in the German North Sea has achieved full project completion. Final completion marks the official end of construction and the start of the operational phase of the project. According to Northland Power, this also signifies that the terms required t

Huisman has signed a contract with PaxOcean Engineering for the delivery of a 1,600mt leg encircling crane for Penta-Ocean Construction’s new self-elevating platform (SEP). The crane, to be built at Huisman’s wholly-owned production facility in Xiamen, China, is expected to enable the SEP for instal