Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Business & FinanceEquipmentProject & Tenders
IEV Malaysia Gets LOA for Deepwater Installation Project
Operations & Maintenance

IEV Malaysia Gets LOA for Deepwater Installation Project

IEV Holdings Limited (the “Company”, and together with its subsidiaries, “IEV” or the “Group”) wishes to announce that, on 16 December 2012, its 49% owned associate, IEV (Malaysia) Sdn. Bhd. (“IEV Malaysia”) received a Letter of Award (“LOA”) for a major transportation and installation project (the

about 13 years ago
Halul Island, Ras Laffan to Be Linked by Subsea Cable (Qatar)
Operations & Maintenance

Halul Island, Ras Laffan to Be Linked by Subsea Cable (Qatar)

Halul Island is set to receive a maximum of 200 megawatts electricity from Ras Laffan through a subsea cable project which will cost more than QR1.6bn, Gulf Times reports. The cable project will consist of two subsea cables of 100 MW each, which will link Halul, situated 100km northeast of Doha, wit

about 13 years ago
BP to Sell Its 34.3 Pct Interest in Yacheng Field (China)
Operations & Maintenance

BP to Sell Its 34.3 Pct Interest in Yacheng Field (China)

BP today announced that it has agreed the sale of its 34.3 per cent interest in the Yacheng gas field in the South China Sea to Kuwait Foreign Petroleum Exploration Company (KUFPEC) for $308 million cash. Subject to regulatory, CNOOC and third party approvals, BP expects the deal to close in the sec

about 13 years ago
Jan De Nul Orders Cable Turntable for Northwind Project Offshore Belgium
Operations & Maintenance

Jan De Nul Orders Cable Turntable for Northwind Project Offshore Belgium

Jan De Nul Group awarded a contract for supply of 5,400 tonnes capacity cable turntable to offshore handling systems specialist Caley Ocean Systems. The turntable, including a 5 tonnes and 10 tonnes deck tensioner, is destined for the vessel Willem de Vlamingh. In addition to this turntable, Caley i

about 13 years ago
Trans Adriatic Pipeline to Start Offshore Surveys in Adriatic Sea
Operations & Maintenance

Trans Adriatic Pipeline to Start Offshore Surveys in Adriatic Sea

TAP plans to start offshore surveys in the Adriatic Sea this winter. The goal is to collect additional data and samples to identify optimal offshore routing. TAP plans offshore surveys that will consist of various investigations along the proposed offshore pipeline route in the Adriatic Sea in inter

about 13 years ago
AMEC Subsidiary qedi Wins Valhall Decommissioning Job from BP
Operations & Maintenance

AMEC Subsidiary qedi Wins Valhall Decommissioning Job from BP

AMEC, the international engineering and project management company announces that subsidiary qedi, a market-leading oil and gas completions and commissioning services company, has been awarded a decommissioning management services contract for three platforms in BP Norway’s Valhall development. qedi

about 13 years ago
USA: Helix Announces Oil Discovery at Wang Well in Gulf of Mexico
Operations & Maintenance

USA: Helix Announces Oil Discovery at Wang Well in Gulf of Mexico

Helix Energy Solutions Group today announced an oil discovery at the Wang exploration well in the Phoenix Field located in Green Canyon Block 237, approximately 93 miles off the Louisiana coast. The Wang exploration well encountered more than 100 feet of high quality net oil pay. Johnny Edwards, Pre

about 13 years ago
New Zealand: CRP Proceeds to Phase Two of Services Contract with Royal Boskalis
Operations & Maintenance

New Zealand: CRP Proceeds to Phase Two of Services Contract with Royal Boskalis

Chatham Rock Phosphate (CRP) advises that it has agreed with Boskalis to proceed to phase two of its services contract. This phase involves the final detailed design of a system for extracting rock phosphate nodules. This phase is a commitment that is estimated to cost around €4 million and is sched

about 13 years ago
USA: BP Again Confirms Macondo Well Integrity
Operations & Maintenance

USA: BP Again Confirms Macondo Well Integrity

BP announced it has once again confirmed the integrity of the Macondo well and its associated relief wells following a recent subsea survey to identify potential sources of a surface sheen near the Deepwater Horizon accident site in the Gulf of Mexico. The latest survey marks the fourth time since t

about 13 years ago
UK: SRSL to Conduct Environmental Surveys for West Islay Tidal Energy Farm
Operations & Maintenance

UK: SRSL to Conduct Environmental Surveys for West Islay Tidal Energy Farm

Environmental consultancy, SRSL has been commissioned by DP Marine Energy Ltd (DPME) to conduct environmental baseline surveys for the proposed West Islay Tidal Energy Farm. This is in addition to producing Environmental Statement chapters assessing the potential impact of the development on marine

about 13 years ago
NPD: Twelve Discoveries Made on Norwegian Shelf in 2012
Operations & Maintenance

NPD: Twelve Discoveries Made on Norwegian Shelf in 2012

So far this year, 12 discoveries have been made on the Norwegian shelf. Six of these were made in the North Sea, and three in the Barents Sea and the Norwegian Sea respectively. A total of 27 wildcat wells have been completed, giving a discovery rate of 44 per cent. So far, 42 exploration wells [&he

about 13 years ago
Denmark: Nexans Connects Anholt Cable Strings to the Substation
Operations & Maintenance

Denmark: Nexans Connects Anholt Cable Strings to the Substation

On 6 July 2012, Nexans started connecting cables which the vessels Stemat 82 and Toisa Wave were laying on the seabed between the substation and the 111 foundations at the Anholt offshore wind farm during summer 2012. Only six months after – on 5 December 2012 – Nexans had completed the work after h

about 13 years ago
UK: Scira Introduces Team that Keeps Blades Turning
Operations & Maintenance

UK: Scira Introduces Team that Keeps Blades Turning

Construction of Sheringham Shoal is complete, now the wind farm will need ongoing maintenance to ensure the blades keep turning and power keeps generating. As well as providing and installing the 3.6MW wind turbines, Siemens also has a five-year service contract with Scira to maintain and repair the

about 13 years ago
UK: Scira Introduces Team that Keeps Blades Turning
Operations & Maintenance

UK: Scira Introduces Team that Keeps Blades Turning

Construction of Sheringham Shoal is complete, now the wind farm will need ongoing maintenance to ensure the blades keep turning and power keeps generating. As well as providing and installing the 3.6MW wind turbines, Siemens also has a five-year service contract with Scira to maintain and repair the

about 13 years ago
  • 1
  • …
  • 1300
  • 1301
  • 1302
  • …
  • 1594