Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Business & FinanceProject & TendersEquipmentResearch & Development
PGS Drops Guidance, Postpones Vessels
Operations & Maintenance

PGS Drops Guidance, Postpones Vessels

Oslo-listed seismic player Petroleum Geo-Services (PGS) said today it expects lower earnings for this year and a further decline in profits in 2015 due to drop in oil prices and exploration cost cuts by the offshore oil companies. The company expects its EBITDA to be around $700 million for the year

about 11 years ago
Boskalis Gets Wikinger OWF Construction Contract
Operations & Maintenance

Boskalis Gets Wikinger OWF Construction Contract

Royal Boskalis Westminster N.V. (Boskalis) in partnership with Volker Stevin International (VolkerWessels) have been awarded a contract by Iberdrola Renewables Offshore Deutschland GmbH for the partial construction of the Wikinger Offshore Wind Farm in German section of the Baltic Sea. The work comp

about 11 years ago
PHOTO: SAL’s MV Frauke Completes Its Job
Operations & Maintenance

PHOTO: SAL’s MV Frauke Completes Its Job

SAL Heavy Lift’s Type 176 vessel MV Frauke successfully finalized her latest project, for which it had been engaged since July 2014. The project consisted of seven phases: – Mobilization and special preparation of the vessel in Germany and the Netherlands; – Loading and transport of two empty carous

about 11 years ago
Esvagt’s SOV to Work on Dudgeon Offshore Wind Farm
Operations & Maintenance

Esvagt’s SOV to Work on Dudgeon Offshore Wind Farm

Dudgeon Offshore Wind Limited has awarded a 5 year contract for the Service Operation Vessel to Esvagt AS. The contracted Service Operation Vessel (SOV) for Dudgeon wind farm is of the Havyard-832 design with a length of 83.7 meters and a width of 17.6 meters. The SOV is a DP-2 Class operated vessel

about 11 years ago
Ennsub Builds Ceona Amazon LARS
Operations & Maintenance

Ennsub Builds Ceona Amazon LARS

Ennsub has completed the design and manufacture of two innovative workclass remotely operated vehicle (WROV) deployment systems which have been designed and manufactured for ROVOP and are due to be installed into a new build, tier one pipelay vessel Ceona Amazon early in 2015. The company demonstrat

about 11 years ago
Hughes SSE Wraps Up Gwynt y Môr Project
Operations & Maintenance

Hughes SSE Wraps Up Gwynt y Môr Project

Hughes Sub Surface Engineering (Hughes SSE) has completed works on the world’s second largest wind farm Gwynt y Môr. Since 2012 Hughes SSE has been a provider of core services to the construction efforts at Gwynt y Môr wind farm. During a 34 month involvement, Hughes SSE provided a combined operatio

about 11 years ago
Ramboll Provides Geotechnical Input for Cross Harbour Tunnel
Operations & Maintenance

Ramboll Provides Geotechnical Input for Cross Harbour Tunnel

Ramboll has been selected as expert reviewer and geotechnical consultant on the North South Line, part of the Hong Kong metro. The metro will help to make life easier for more than 1 million people every day. Ramboll was selected by PY Pun-KD to provide geotechnical input for the underwater Cross Ha

about 11 years ago
Schlumberger Bags Mariner Contract from Statoil
Operations & Maintenance

Schlumberger Bags Mariner Contract from Statoil

Statoil has on behalf of the Mariner co-venturers awarded the contract for integrated drilling and well services on the Mariner field on the UK continental shelf (UKCS) to Schlumberger Oilfield UK Plc. “This is a very significant agreement for the Mariner project, and the result of an innovative, ne

about 11 years ago
Rem Offshore Puts Off Newbuild Delivery
Operations & Maintenance

Rem Offshore Puts Off Newbuild Delivery

Norway’s Rem Offshore and Vard Group have agreed to postpone delivery of the OCV (Offshore Construction Vessel). Namely, in June 2014, Rem Offshore entered into a newbuilding contract with Vard for delivery in the first quarter of 2016. However, under the new agreement, delivery of the vessel is sch

about 11 years ago
Polarcus Wins WA Shoot for Parenco
Operations & Maintenance

Polarcus Wins WA Shoot for Parenco

Oslo-listed seismic player Polarcus has inked a a Letter of Intent (LOI) with Perenco Oil & Gas Gabon for a 3D marine seismic acquisition project offshore West Africa. The survey will be acquired by the company’s 12 streamer 3D/4D seismic vessel Polarcus Nadia. The 88.8 meters long, ULSTEIN SX124 de

about 11 years ago
FMC Technologies Subsea Systems for Eni’s East Hub
Operations & Maintenance

FMC Technologies Subsea Systems for Eni’s East Hub

FMC Technologies, Inc. has received an order from Eni Angola to supply subsea production systems for its deepwater Block 15/06 East Hub development. The order has an estimated value of $393 million in revenue. “We are pleased to have been awarded the subsea production systems contract for Eni’s Bloc

about 11 years ago
Huntington at Reduced Rates, Full Production Further Delayed
Operations & Maintenance

Huntington at Reduced Rates, Full Production Further Delayed

Norwegian Energy Company ASA (Noreco) has been informed that a temporary approval has been granted to resume production at reduced rate at the Huntington field, and that the field is now on stream. Until normal access to the CATS system has been restored, Noreco expects that daily production from Hu

about 11 years ago
Primeline Commercialises LS36-1 Gas
Operations & Maintenance

Primeline Commercialises LS36-1 Gas

Primeline has started the commercial production at its LS36-1 gas field, after trial production having been successfully completed. The production period under the Petroleum Contract for Block 25/34 has accordingly began. The Joint Management Committee (JMC) established by China National Offshore Oi

about 11 years ago
Subsea 7 to Reorganise
Operations & Maintenance

Subsea 7 to Reorganise

Seabed-to-surface engineering contractor, Subsea 7, has announced that, with effect from 1 January 2015, it will be changing the organisational structure of its business. According to the company, its to better align Group’s strategic priorities and to further strengthen the its execution capabiliti

about 11 years ago
  • 1
  • …
  • 997
  • 998
  • 999
  • …
  • 1594