The jacket foundations for the Hornsea Two offshore substation and reactive compensation station (RCS) have set sail from Indonesia towards the project site in the UK. The structures weighing over 10,000 tons departed Batam on 13 August onboard heavy transport vessel (HTV) Big Lift Barentsz. The jou

Vattenfall has issued a tender for inter-array cable replacement at the DanTysk offshore wind farm in the German North Sea. The tender also concerns cable protection system (CPS) replacement, including the design, supply and installation of CPS and CPS stabilization. Vattenfall said it had conducted

NASH Maritime has been selected as the shipping and navigation consultant for the 96 MW Erebus floating wind project in the Celtic Sea offshore Wales, UK. NASH Maritime’s scope includes the delivery of radar vessel traffic surveys, which commenced this month, a Navigation Risk Assessment (NRA) and i

Oslo-listed DOF Subsea said it has secured multiple new contracts in the Atlantic region. Specifically, the contract awards include work within survey, inspection, maintenance & repair and decommissioning. The company plans to deploy a selection of vessels to undertake the work, including Skandi Ace

Scottish offshore wind farm Neart na Gaoithe (NnG) has entered the first phase of offshore construction, with Saipem’s vessel S7000 set to start installing pile casings at the site some 15 kilometres off the Fife coast. The 197.5-metre semi-submersible crane vessel will also prepare the seabed for t

UK-headquartered consultancy company BVG Associates has been awarded a contract by the North Carolina Department of Commerce to assist the agency with an offshore wind industry supply chain and infrastructure assessment. BVG Associates will help the Department research and develop an inventory of bu

The CrossWind consortium of Shell and Eneco has awarded Fugro a geotechnical site investigation contract for the Hollandse Kust (noord) offshore wind farm. The work will comprise an unexploded ordnance (UXO) site clearance survey followed by a seabed cone penetration test (CPT) investigation. For th

German transmission system operator (TSO) 50Hertz and Belgian TSO Elia have issued a call for tenders, under which they will award framework agreements for external resource services for offshore projects and regional centres in the two countries. The TSOs are looking to enter framework agreements f

Bladt Industries has selected Energomontaż-Północ Gdynia (EPG) as a subcontractor for the prefabrication of the offshore substation topside and sea fastening for the Kaskasi offshore wind project in Germany. The Polish company started the production of steel structure in July in Gdynia. Bladt is in

78 out of 94 Siemens Gamesa 8 MW turbines have been installed at the Borssele 1 & 2 offshore wind project in the Netherlands. DEME’s jack-up tandem Sea Installer and Sea Challenger are in charge of installing the turbines at the site located 22km off the coast of the province of Zeeland. According t

Vestas has secured a 50 MW wind turbine order for the second phase of the Hoa Binh 1 intertidal wind farm in Vietnam. The wind turbine supplier received an order for the project’s first 50 MW phase in December 2019, which included 13 V150-4.2 MW turbines, with ten of them delivered in 3.8 MW and [&h

ORPC has selected Downeast Machine & Engineering to build the structural components for its second commercial RivGen power system device. The Portland-based company will install the device in Igiugig, Alaska, in 2021, as part of a multi-year project. The project gets support from the US DOE as wel

Prysmian has started installing the export cables which will connect the 480 MW Saint-Nazaire offshore wind farm to the French grid. The Italian cable manufacturer deployed its cable-laying vessel Cable Enterprise on the project. The cable pull-in operations started off the Courance beach on Sunday,

Transmission system operator TenneT has awarded the consortium of Siemens AG and Dragados Offshore SA with a contract to build onshore and offshore converter stations for the 900 MW BorWin5 grid connection. At 230 kilometres, BorWin5 will be the longest offshore direct current connection to date, sc